13
CASE INSTALLATION
DRAIN and PUMP SET-UP
1.
1. The shipped-loose evaporation pan gets installed at
the rear left top of case. Cut away an excess section (18”
to 24” typical) of the plastic tubing for use in laterstep.
2.
Hook “V” of metal cover under
fl
ange and rotate cover
onto pan.
3.
Install platic bushing in cover. Place tube (from pump)
through bushing to grip and into pan.
4.
Place end of tube into cut-out section of cover, so that
pumped condensate water is directed into the pan.
5.
Place the short (18”) section of tubing onto the over-
fl
ow tube of the pan, and direct the tube to the rear
back of the case. (In event of components wearing out
in future, water will be directed to the
fl
oor rather than
collecting on the case top).
6.
Fasten pan to the case with #8 screws provided.
Содержание JNRBHSA
Страница 2: ...ii ...
Страница 33: ...B2 SEISMIC BRACKETS 5 BRACKETS ...
Страница 34: ...C1 SPORLAN PRESSURE TEMPERATURE CHART ...
Страница 38: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E3 ELECTRICAL WIRING DIAGRAM ...
Страница 39: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E4 ELECTRICAL WIRING DIAGRAM ...
Страница 46: ...G1 FASCIA FRAME ...
Страница 47: ...G2 FASCIA FRAME ...
Страница 48: ...G3 FASCIA FRAME ...
Страница 49: ...G4 FASCIA FRAME ...
Страница 50: ...G5 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 51: ...G6 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 53: ...G8 FASCIA FRAME JNRZHSA 5 BALLOON GUARD INSTALLATION ...
Страница 55: ...I1 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 56: ...I2 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 57: ...v Ϯ Z Ͳ ϱ Z EZ v Ϯ Z Ͳ ϰ Z EZ v ϱ EZ J1 CONDENSING UNIT LOCATIONS ...