18
REFRIGERATION
The condensing unit (Fig. 5) is located on top of the case
for easy access. Refrigerant piping runs down the rear of
the case to and from the coil. The expansion valve and
other controls, which are located on the left-hand side
of the case, are accessed by lifting the left-hand deck
pans—lifting the fan plenum is not required.
Before operating the case, be certain to remove any shipping
blocks that protect the refrigeration lines during shipping.
If it becomes necessary to penetrate the case tank
in any area, be certain to seal any open gaps afterwards
with canned-foam sealant and white RTV.
PLUMBING
The drain outlet is specially molded out of PVC material
and is located at the front-center of the case for convenient
access. The “P” trap that is furnished with the case
is constructed of schedule 40 PVC pipe (Fig. 6). Case
run-off should be channeled to a
fl
oor drain located under-
neath the case.
NOTE:
fl
oor-drain cases are intended for use with
fl
oor drains only—evaporative heater pans are neither
permitted nor offered with
fl
oor-drain case con
fi
gurations
per DOE requirements.
Since the kickplate is shipped loose with the case, you
should have open access to the drain line area during instal-
lation. If the kickplate has been installed, you will
fi
nd
it easy to remove. Simply remove the kickplate joint trim,
then unscrew the upper and lower kickplates from the
kickplate supports and remove (see Trim Out instructions
on pages 12-14).
Care should be given to ensure that all connections are
water-tight and sealed with the appropriate PVC or ABS
cement.
ELECTRICAL
Electrical connections are made in the electrical junction
box located at the top rear-left of the case (Fig. 7). The
cases use a Carel IR33+ case controller. Lighting for reach-
in door cases is pre-installed during manufacturing. Lighting
controlled through motion sensors is stan-dard on the case.
If using Anthony door/frame, the anti-sweat control through
embedded controller is standard offering on the case. For any
questions or service needs, please contact our Case Division
Customer Service Department.
CASE CONNECTIONS
A T T E N T I O N
Connections are illustrated in dimensional drawing
found in Appendix A.
▲
!
For more detailed electrical wiring information, see
Appendix
E
. For more detailed information on the Carel
IR33+ controller and setpoints, see
Appendix F.
A T T E N T I O N !
If brazing is necessary, place wet rags
around the area to avoid tank damage.
A T T E N T I O N !
Be certain that all piping and electrical
connections comply with local codes.
A T T E N T I O N !
Case requires 4-Wire Power From Store.
Neutral Wire Must be connected prior to
starting case or else damage may occur.
Fig. 6 Condensing unit on top of case
Fig. 7 “P” trap; drain line
Fig. 8 Electrical junction box on top of
case
Содержание JNRBHSA
Страница 2: ...ii ...
Страница 33: ...B2 SEISMIC BRACKETS 5 BRACKETS ...
Страница 34: ...C1 SPORLAN PRESSURE TEMPERATURE CHART ...
Страница 38: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E3 ELECTRICAL WIRING DIAGRAM ...
Страница 39: ...Display Cases 5XIILQ 0LOO 5RDG RORQLDO HLJKWV 9 E4 ELECTRICAL WIRING DIAGRAM ...
Страница 46: ...G1 FASCIA FRAME ...
Страница 47: ...G2 FASCIA FRAME ...
Страница 48: ...G3 FASCIA FRAME ...
Страница 49: ...G4 FASCIA FRAME ...
Страница 50: ...G5 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 51: ...G6 FASCIA FRAME OPTIONAL MOTION SENSOR INSTALLATION ...
Страница 53: ...G8 FASCIA FRAME JNRZHSA 5 BALLOON GUARD INSTALLATION ...
Страница 55: ...I1 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 56: ...I2 CASE LIFTING LOCATIONS Base Frame Lifting Locations for Forklift JNRBHSA JNRZHSA ...
Страница 57: ...v Ϯ Z Ͳ ϱ Z EZ v Ϯ Z Ͳ ϰ Z EZ v ϱ EZ J1 CONDENSING UNIT LOCATIONS ...