P l e a s e G i v e P a r t N o . , D e s c r i p t i o n a n d U n i t S e r i a l N o .
HIGHWAY EQUIPMENT COMPANY
31
89008-A
Page Rev. A
- -
[TARGET: 600]
OPERATING PROCEDURES CONTINUED
SPINNER SPEED
When the optional PWM spinner valve is installed on your spreader and the appropriate Machine
Settings are set to operate the valve, spinner speed adjustment can be made through the Mark V. This
control is “open loop”. The Mark V can read the spinner speed and display the target speed, but the
user needs to initiate the action to adjust the speed.
The following instructions are valid only with the optional valve.
Changing spinner speed
When a job is first activated, the Mark V adjusts the spinner valve to be near the target spinner speed.
However, it will need to be fine tune adjusted to the target speed. The closest you should expect to fine
tune adjust the speed is within 10 rpm from the target speed.
To adjust the speed, do the following:
Make sure the arrows symbol is displayed next to the Spinner Speed display line. If the arrows symbol
is not displayed, press the adjacent Display Selection key twice to activate and remove the selection
box.
Press the Up or Down Keys to change to the desired spinner speed.
The Mark V remembers the last spinner valve setting for each job. If you change jobs or when you turn
the monitor back on, the valve will be adjusted to the last valve adjustment.
RATE
250
lbs/ac
GROUND SPEED
16.5
mph
SPIN. SPEED
590
rpm
TOT. APPLIED
1750
lbs
Applying: UREA
CONVEYOR OFF
JOB
SETUP
CLEAR
LIGHTBAR
Figure 15
Indicates pressing
Up or Down Arrow
keys will change
speed. If arrows not
present, press key to
right of line twice.
Содержание New Leader MARK V DGPS-Ready
Страница 2: ......