![HighLine Bale Pro CFR651 Скачать руководство пользователя страница 67](http://html1.mh-extra.com/html/highline/bale-pro-cfr651/bale-pro-cfr651_operators-manual_2130606067.webp)
Section 6 - Storing the CFR 651
5. Lock the CFR 651 flail drum.
-
Place the flail drum lock pin into the
tube on the front tub wall.
-
Allow the lock pin to slid into the
processing chamber.
-
Manually rotate the flail drum until the
lock pin drops into place locking the
flail drum.
-
Push the lock pin down firmly to
ensure it is fully engaged into the flail
drum.
6. Remove any material that has built up
around the feeder chain bearings.
-
Remove any material from the upper
feeder chain bearing.
-
Remove any material from around the
lower feeder chain bearing.
-
Remove any material from the
channel between the upper and lower
feeder chain bearings.
Lock the Flail Drum
213018
Remove Material - Upper Chain Bearing
212016
Remove Material - Lower Chain Bearing
212015
Page 6-2
Содержание Bale Pro CFR651
Страница 1: ...O p e r a t o r s M a n u a l E12033V3_A Bale Pro Complete Feed Ration CFR651...
Страница 7: ...This Page Left Blank...
Страница 17: ...Section 1 Safety 216197 SAFETY DECAL LOCATIONS Page 1 10...
Страница 43: ...Section 3 Preparing the CFR 651 This Page Left Blank Page 3 18...
Страница 71: ...Section 6 Storing the CFR 651 This Page Left Blank Page 6 6...
Страница 75: ...Section 8 Specifications Tires 16 5LX 16 1 ANS Inflate to 24 psi Gearbox Oil Capacity 300 ml Page 8 2...