Section 3 - Preparing the CFR 651
Remove Flail Drum Access Panels
213177C
3. At the front of the machine, move the flail
guard rod adjustment lever to a number
between 1 and 4.
Note: Having the lever at position 5 will
result in damage to the twine
cutter blade.
4. Open the front drive shield.
5. Rotate the flail drum to align the knife
path with the tub opening (1).
6. Place the flail drum lock pin (2) into the
tube on the front tub wall.
-
Allow the lock pin to slid into the
processing chamber.
-
Manually rotate the flail drum until the
lock pin drops into place locking the
flail drum.
-
Push the lock pin down firmly to
ensure it is fully engaged into the flail
drum.
7. Remove the flail drum access panels.
-
Remove the clip pins.
-
Remove the panel pins (1).
Lift the panels out.
Move Flail Guard Rod Lever
(to less than 5)
213018
Align Knife Path & Insert Lock Pin
213019C
Page 3-14
Содержание Bale Pro CFR651
Страница 1: ...O p e r a t o r s M a n u a l E12033V3_A Bale Pro Complete Feed Ration CFR651...
Страница 7: ...This Page Left Blank...
Страница 17: ...Section 1 Safety 216197 SAFETY DECAL LOCATIONS Page 1 10...
Страница 43: ...Section 3 Preparing the CFR 651 This Page Left Blank Page 3 18...
Страница 71: ...Section 6 Storing the CFR 651 This Page Left Blank Page 6 6...
Страница 75: ...Section 8 Specifications Tires 16 5LX 16 1 ANS Inflate to 24 psi Gearbox Oil Capacity 300 ml Page 8 2...