![HighLine Bale Pro CFR651 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/highline/bale-pro-cfr651/bale-pro-cfr651_operators-manual_2130606024.webp)
Section 2 - Transporting the CFR 651
14.
Raise the bale loading forks to the
highest position.
15.
Install the cylinder lock (1) on the
cylinder of the bale loading forks.
-
Fasten the cylinder lock in place
with the pin (2).
16.
Raise the discharge deflector door to
the transport position.
-
The discharge deflector door is
operated by a hydraulic cylinder.
Note: If the 2 remote option is
installed, the door cylinder will be
linked to the bale lift hydraulic circuit
through an electric solenoid
-
Move the electric selector valve so
the hydraulic flow goes to the door
cylinder.
17.
Install the discharge deflector door
transport lock.
-
Rotate the short link (1) toward the
cylinder.
-
Join the flats by inserting the pin of
the short flat into the longer flat (2).
-
Install the clip pin (3).
18.
Secure the rubber panel on door.
-
Place the rubber panel into the tabs
(1) and fasten with a washer and nut
(2) to prevent the wind from blowing
the rubber panel from the tabs during
transport.
Fork Cylinder Resting on Lock
216193C
Deflector Door Lock
212040C
Discharge Door Raised - Rubber Secured
212019C
Page 2-7
Содержание Bale Pro CFR651
Страница 1: ...O p e r a t o r s M a n u a l E12033V3_A Bale Pro Complete Feed Ration CFR651...
Страница 7: ...This Page Left Blank...
Страница 17: ...Section 1 Safety 216197 SAFETY DECAL LOCATIONS Page 1 10...
Страница 43: ...Section 3 Preparing the CFR 651 This Page Left Blank Page 3 18...
Страница 71: ...Section 6 Storing the CFR 651 This Page Left Blank Page 6 6...
Страница 75: ...Section 8 Specifications Tires 16 5LX 16 1 ANS Inflate to 24 psi Gearbox Oil Capacity 300 ml Page 8 2...