![HighLine Bale Pro CFR651 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/highline/bale-pro-cfr651/bale-pro-cfr651_operators-manual_2130606020.webp)
Section 2 - Transporting the CFR 651
4. Lift the hitch.
-
Lift the Hitch with the jack (1).
-
The hitch is heavy. Do not attempt
to lift it without using the jack.
5. Connect the hitch to the tractor clevis
drawbar.
-
Use a 1" (25 mm) pin.
-
Secure with a hitch pin clip.
6. Connect the safety chain
.
-
Ensure the safety chain rating is equal
or greater than the gross weight of the
loaded CFR 651.
-
Route the safety chain around the
lower safety chain bolt (1).
-
Attach the chain to a secure location
on the tractor (2).
-
Fasten the chain hook with the hook
lock.
7. Route the hydraulic hoses and wiring
harness through the hose support arm.
Lift Hitch with the Jack
213174C
Connect Hitch & Safety Chain to Tractor
213175C
Hoses and Electrical in Support Arm
211217
Page 2-3
Содержание Bale Pro CFR651
Страница 1: ...O p e r a t o r s M a n u a l E12033V3_A Bale Pro Complete Feed Ration CFR651...
Страница 7: ...This Page Left Blank...
Страница 17: ...Section 1 Safety 216197 SAFETY DECAL LOCATIONS Page 1 10...
Страница 43: ...Section 3 Preparing the CFR 651 This Page Left Blank Page 3 18...
Страница 71: ...Section 6 Storing the CFR 651 This Page Left Blank Page 6 6...
Страница 75: ...Section 8 Specifications Tires 16 5LX 16 1 ANS Inflate to 24 psi Gearbox Oil Capacity 300 ml Page 8 2...