Section 3 - CFR 650 Preparation
6. Check the condition of the flails.
-
Inspect the flails daily.
Spin the drum by hand to check all the
flails.
-
Check that the flails swing freely.
-
Check if they are broken or worn to
the point that they would not process
the material properly.
-
See the Section 5 - "Maintaining the
CFR 650" for flail replacement
information.
-- Replace the flails in pairs.
-- Replace on opposite sides of
the drum to maintain drum
balance.
-
Check the condition of the flail
mounting bolts. Ensure the mounting
bolts are tight.
7. Remove twine, netwrap or other materials
wrapped around the flail drum or drum
bearings.
Note: Remove the netwrap or twine from
the flail drum every 25 bales.
Premature bearing failure can
occur if twine is allowed to build up
on the flail drum.
See "Netwrap or Twine Removal
Procedure" at the end of this Section.
Check Flails
214082
Remove Netwrap & Twine
214083
Page 3-2
Содержание Bale Pro CFR650
Страница 1: ...O p e r a t o r s M a n u a l E9813V1 Bale Pro Complete Feed Ration CFR650 ...
Страница 7: ...This Page Left Blank ...
Страница 17: ...Section 1 Safety 650DecalIso2 SAFETY DECAL LOCATIONS Page 1 10 ...
Страница 27: ...Section 2 Transporting the CFR 650 This Page Left Blank Page 2 10 ...
Страница 55: ...Section 5 Maintaining the CFR 650 This Page Left Blank Page 5 8 ...