Section 4 - Operating the CFR 650
6. Lower the forks and load a second bale
(optional).
Another bale may be loaded onto the
forks while a bale is in the processor.
If a bale is loaded onto the forks, raise the
forks as high as possible. Make sure the
bale on the forks does not interfere with
the bale already in the tub.
-
Raising the forks will reduce the
pressure on the hydraulic lift
assembly.
7. Start the PTO to engage the flail drum.
Stay clear from discharge side
when PTO is engaged.
Do not operate within 100 ft (30m)
of any person.
Discharged material or objects
leaving the discharge area can
cause serious injury or death.
The CFR 650 shall not be
operated without the guards in
place or in good condition.
-
Engage the tractor PTO at an idle.
-
Increase the tractor RPM until 1000
PTO speed is reached.
Note: Ensure that the carried bale does not
interfere with the bale in the tub.
Second Bale Loaded on Forks
201220-2
Page 4-5
Содержание Bale Pro CFR650
Страница 1: ...O p e r a t o r s M a n u a l E9813V1 Bale Pro Complete Feed Ration CFR650 ...
Страница 7: ...This Page Left Blank ...
Страница 17: ...Section 1 Safety 650DecalIso2 SAFETY DECAL LOCATIONS Page 1 10 ...
Страница 27: ...Section 2 Transporting the CFR 650 This Page Left Blank Page 2 10 ...
Страница 55: ...Section 5 Maintaining the CFR 650 This Page Left Blank Page 5 8 ...