Section 2 - Transporting the CFR 650
14.
Raise the bale loading forks to the
highest position.
15.
Install the cylinder lock (1) on the
cylinder of the bale loading forks.
-
Fasten the cylinder lock in place
with the pin (2).
16.
Raise the discharge deflector door to
the transport position.
-
The discharge deflector door is
operated by a hydraulic cylinder.
Note: This door cylinder may be linked to
the feed roller hydraulic circuit
through an optional electric
solenoid
-
Place the rubber panel into the tabs
(1) and fasten with a washer and nut
(2) to prevent the wind from blowing
the rubber panel from the tabs during
transport.
17.
Install the discharge deflector door
transport lock.
-
Rotate the short link (1) toward the
cylinder.
-
Join the flats by inserting the pin of
the short flat into the longer flat (2).
-
Install the clip pin (3).
Fork Cylinder Resting on Lock
201197C
Discharge Door Raised - Rubber Secured
201198C
Deflector Door Lock
201201C
Page 2-8
Содержание Bale Pro CFR650
Страница 1: ...O p e r a t o r s M a n u a l E9813V1 Bale Pro Complete Feed Ration CFR650 ...
Страница 7: ...This Page Left Blank ...
Страница 17: ...Section 1 Safety 650DecalIso2 SAFETY DECAL LOCATIONS Page 1 10 ...
Страница 27: ...Section 2 Transporting the CFR 650 This Page Left Blank Page 2 10 ...
Страница 55: ...Section 5 Maintaining the CFR 650 This Page Left Blank Page 5 8 ...