f) Align the front of the rail with the holes on the rack stems that will receive the support posts and pull
the rail toward the holes until the tool-less latching mechanism engages the rack.
Figure 54: Front Rail Mechanism Operation
g) Latch the front rail mount to the rack by sliding the latch over the rack holes.
12. Slide the enclosure into the rack.
a) Pull the rack mounted rails out towards the front of the rack until they are locked in place.
Figure 55: Rack Mounted Rails Locked
b) Line up the enclosure with the rack mounted rails and slide it in until the first set of locks engage.
57
3
Part Replacement
User Guide
3.4
Rails Replacement
Содержание ULTRASTAR SERV24
Страница 1: ...User Guide Ultrastar Serv24 S2122 N24 4 Version 1 3 August 2018 1ET1083 Long Live Data www hgst com...
Страница 12: ...One dedicated 1 GbE port for IPMI 12 1 Ultrastar Serv24 Overview User Guide 1 1 Ultrastar Serv24 Description...
Страница 14: ...Figure 4 I2C Block Diagram 14 1 Ultrastar Serv24 Overview User Guide 1 2 Block Diagrams...
Страница 111: ...1 2 3 4 Pin Pin 12 Install the air duct modules 111 3 Part Replacement User Guide 3 8 Heat Sink Replacement...
Страница 206: ...Authority or Mark Country Region SII Israel NRCS South Africa 206 5 Disclaimers User Guide 5 5 Country Certifications...