c) Align the posts at the U-height desired for installation. The bottom of the rail will align with the lowest
hole in the U.
d) Pull the rail toward the rack step with the support posts aimed at the holes on the rack stems until the
tool-less latching mechanism engages the rack.
Figure 53: Front Rail Mechanism Operation
e) Move to the front of the rack.
56
3
Part Replacement
User Guide
3.4
Rails Replacement
Содержание ULTRASTAR SERV24
Страница 1: ...User Guide Ultrastar Serv24 S2122 N24 4 Version 1 3 August 2018 1ET1083 Long Live Data www hgst com...
Страница 12: ...One dedicated 1 GbE port for IPMI 12 1 Ultrastar Serv24 Overview User Guide 1 1 Ultrastar Serv24 Description...
Страница 14: ...Figure 4 I2C Block Diagram 14 1 Ultrastar Serv24 Overview User Guide 1 2 Block Diagrams...
Страница 111: ...1 2 3 4 Pin Pin 12 Install the air duct modules 111 3 Part Replacement User Guide 3 8 Heat Sink Replacement...
Страница 206: ...Authority or Mark Country Region SII Israel NRCS South Africa 206 5 Disclaimers User Guide 5 5 Country Certifications...