1.5
Ultrastar Serv24 Layout
Figure 5: Ultrastar Serv24 Layout
1
3
4
2
5
6
Table 5: Ultrastar Serv24 Layout
Component
Number
Rails
1
Drive Bay
2
CMA
3
PSU Bay
4
Chassis Cover w/ latch
5
Chassis
6
1.6
Ultrastar Serv24 Rack Requirements
The Ultrastar Serv24 is designed to be installed into a rack that meets the EIA-310 standard at a minimum.
See EIA-310 Rack Standard of usable space measured from front rack frame to the rear rack frame. It requires
2U of rackspace, and it should be installed into the rack at the lowest possible U height to keep the load on
the rack balanced.
18
1
Ultrastar Serv24 Overview
User Guide
1.5
Ultrastar Serv24 Layout
Содержание ULTRASTAR SERV24
Страница 1: ...User Guide Ultrastar Serv24 S2122 N24 4 Version 1 3 August 2018 1ET1083 Long Live Data www hgst com...
Страница 12: ...One dedicated 1 GbE port for IPMI 12 1 Ultrastar Serv24 Overview User Guide 1 1 Ultrastar Serv24 Description...
Страница 14: ...Figure 4 I2C Block Diagram 14 1 Ultrastar Serv24 Overview User Guide 1 2 Block Diagrams...
Страница 111: ...1 2 3 4 Pin Pin 12 Install the air duct modules 111 3 Part Replacement User Guide 3 8 Heat Sink Replacement...
Страница 206: ...Authority or Mark Country Region SII Israel NRCS South Africa 206 5 Disclaimers User Guide 5 5 Country Certifications...