21
Henrad CC FF
- Installation
22
DRILLING THE WALL (Side Flue)
23
FITTING THE WALL MOUNTING FRAME
Fit the wall mounting frame, either:
a.
Directly to the wall
!
!
!
!
!
Insert the wall plugs.
!
!
!
!
!
Put the screws into the wall plugs and
leave 10mm proud
!
!
!
!
!
Hang the frame onto the screws and
tighten up
or
Proceed to Frame 24.
Note.
If the clearances above and below the
boiler are less than the length of the pipes it will
be necessary to position the pipes behind the
wall mounting plate BEFORE the plate is
screwed to the wall.
Note.
If the terminal is to be sited within 25-40mm of a corner or vertical pipe (refer to
Table 3) then the hole MUST be accurately cut and the rubber weather seal trimmed
around the groove provided. (The terminal wall plate need not be fitted.)
IMPORTANT. Ensure that, during the cutting operation,
masonry falling outside the building does not cause
damage or personal injury.
1. Cut the flue hole (preferably with a 5" core
boring tool), ensuring that the hole is square to
the wall.
Both wall faces immediately around the cut hole
should be flat.
2. Measure and note the wall thickness 'W'.
3. Drill 6 holes with an 8mm (
5/16
") masonry drill.
INSTALLATION
SIDE FLUE OUTLET
Make service water, gas & electrical connections. Go to Frames 35, 36 & 39 then return to Frame 15.