51
7
7))
Place connector on flat surface with the open side up.
8
8))
Hold connector in place with one hand, use other hand to insert pocket knife
blade or other small sharp tool into connector notch to depress metal locking
tab.
9
9))
Continue to hold locking tab down and pull lead wire out of the rear of connector
and remove probe from fryer.
1
10
0))
Place nut and new ferule on new oil level probe and insert probe into
compression fitting.
1
11
1))
Locate temperature probe through pot wall.
1
12
2))
Place gauge against pot wall as shows in
Содержание LVE-202
Страница 2: ......
Страница 6: ...Contents iv...
Страница 8: ...Preface vi...
Страница 24: ...Info Filter Temp Button Stats 12...
Страница 32: ...Level 2 Programming 20...
Страница 50: ...Maintenance 38 NOTE Oil temp must be 380 F 193 C to perform this check...
Страница 88: ...Maintenance 76...
Страница 90: ......
Страница 91: ......
Страница 92: ...Wiring Diagrams 155...
Страница 93: ...Wiring Diagrams 156...
Страница 94: ...Wiring Diagrams 157...
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ...Wiring Diagrams 161...
Страница 99: ...Wiring Diagrams 162...
Страница 100: ...Wiring Diagrams 163...
Страница 101: ...Wiring Diagrams 164...
Страница 102: ...Wiring Diagrams 165...
Страница 103: ...Wiring Diagrams 166...
Страница 104: ...Wiring Diagrams 167...
Страница 105: ...Wiring Diagrams 168...
Страница 106: ...Wiring Diagrams 169...
Страница 107: ...Wiring Diagrams 170...
Страница 108: ...Wiring Diagrams 171...
Страница 109: ...Wiring Diagrams 172...
Страница 111: ...Wiring Diagrams 174...
Страница 112: ...Wiring Diagrams 175 Figure 10 1 Plumbing Diagram...
Страница 113: ...Wiring Diagrams 176...
Страница 114: ...blank page...