![Henny Penny EEG-16X Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/henny-penny/eeg-16x/eeg-16x_operators-manual_2124320052.webp)
42
1
1))
Make sure the main power switch is in the on position.
2
2))
Open the door, lift-up on the drain pan stop and pull-out the drain pan assembly,
using the handle on the drain pan.
B
BU
UR
RN
N R
RIIS
SK
K
•
T
Th
hiiss p
pa
an
n cco
ou
ulld
d b
be
e h
ho
ott!! U
Usse
e p
prro
otte
eccttiivve
e ccllo
otth
h o
orr
g
gllo
ovve
e,, o
orr sse
evve
erre
e b
bu
urrn
nss cco
ou
ulld
d rre
essu
ulltt..
•
IIff tth
he
e ffiilltte
err p
pa
an
n iiss m
mo
ovve
ed
d w
wh
hiille
e ffu
ullll o
off o
oiill,, u
usse
e
cca
arre
e tto
o p
prre
evve
en
ntt ssp
plla
assh
hiin
ng
g,, o
orr b
bu
urrn
nss cco
ou
ulld
d
rre
essu
ulltt..
3
3))
Lift the pan cover from the drain pan.
4
4))
Lift the crumb basket from the drain pan. Wipe the oil and crumbs from the
crumb basket. Clean the crumb basket with soap and water, then thoroughly
rinse with hot water.
Содержание EEG-16X
Страница 2: ......
Страница 10: ...Preface viii...
Страница 12: ...Introduction 2...
Страница 22: ...Installation 12 Figure 2 3 2 Well Dimensions Figure 2 4 3 Well Dimensions...
Страница 23: ...Installation 13 Figure 2 5 4 Well Dimensions...
Страница 24: ...Installation 14...
Страница 66: ...Operation 56...
Страница 72: ...Information Mode 62...
Страница 76: ...Product Program Mode 66...
Страница 92: ...Troubleshooting 82...
Страница 93: ...blank page...