US
ER
G
ENER
A
L
S
PE
CI
A
LI
S
T PER
S
O
NNEL
20
KWL Hygrobox KWL HB.. EH/WW
Installation and Operating Instructions
EN
EN
• In the following items, the relay outputs can be activated and deactivated manually.
• When
E-heating Act.
is set, the
Open Mixer
and
Close
Mixer
items are replaced by
E-heating 2
and
E-heating
3
.
• With the
UVC Check
parameter set, the current light out-
put of the UVC pipe is determined. At the top right, the
current value and the value calibrated is displayed un-
derneath that (light output of the new pipe). In compari-
son with the calibrated value, the light output is shown
as a percentage.
• This parameter is used to check the function of the floa-
ting switch. When the float is raised, the „>“ character
changes from
Off
to
On
.
• The
opening time for the water valve
is set when the
water tank is filled (water level after water replacement).
Setting range:
20 – 600 seconds
Factory setting:
260 seconds KWL HB 250,
180 seconds KWL HB 500
• This
parameter
is used to set the refill time of the water
during humidity control. The air humidity is determined
every minute. When the reference value is undershot, the
valve is opened according to a set value.
Setting range:
1 – 70 seconds
Factory setting:
30 seconds KWL HB 250,
40 seconds KWL HB 500
• With this parameter, the
runtime of the mixer
can be set.
Setting range:
2 – 30 seconds
Factory setting:
6 seconds
• With the Time Interval Mixer parameter, the interval time
according to which the control system readjusts the mi-
xer can be set.
Setting range:
1 – 120 minutes
Factory setting:
5 minutes
• Defines the runtime of the rinsing programme.
Setting range:
1 – 20 minutes
Factory setting:
10 minutes
• Indicates the operating hours of the UVC pipe.
<
Umwälzpumpe
Enthärterp.
<
Umwälzpump Ein<
Aus
Enthärterp. Ein<
Aus
Motor
<
<
Ventil
<
Mischer Zu
Ablauf Pumpe <
<
Mischer Auf
Motor
Ein<
Aus
Ventil
Ein<
Aus
Mischer Zu Ein<
Aus
Aus
AblaufPumpe Ein<
Mischer Auf Ein<
Aus
E-
Aus
Heizung 1 <
E-Heizung 1 Ein<
<
Ventilator
Ventilator Ein<
Aus
<
UVC-Lampe
UVC-Lampe Ein<
Aus
Hupe
<
Hupe
Ein<
Aus
E- Heizung
<
E- Heizung Akt.
Deakt
.<
<
UVC-Check
UVC-Check 3,65
80%
Cal: 4,56
Schwimmschalter<
Schwimmschalter
>Ein Aus
Zeit Vent.WaWe
. <
Zeit Vent. WaWe.
260s
Laufzeit Misch. <
Laufzeit Misch.
006s
Zeit Vent. Regl.
030s
Zeit Vent. Regl. <
Zeit Spülen
<
010min
Zeit Spülen
<
Betrieb UVC
Betrieb UVC
00
001 h
Zeit Int. Misch.
<
005min
Zeit int. Misch.