Heat & Glo • FDN-4-SS, FDN-5-SS, FDN-6-SS, FDN-7-SS Installation Manual • 16400-9800 Rev. H • 11/19
26
H. ROOF TERMINATION CAP INSTALLATION - WITH AND WITHOUT OPTIONAL DAMPER
8 - VENTING
POWERVENT
MOUNTING BRACKETS
OR DRILL MOUNTING
HOLES TO MATCH
BASE
STEEL CHIMNEY ADAPTER
INSULATION PAD MUST BE CUT IN
CENTER TO ACCOMMODATE VENT SIZE.
PLACE FOIL SIDE UP.
POWERVENT
MOUNTING BRACKETS
OR DRILL MOUNTING
HOLES TO MATCH BASE
OPTIONALMECHANICAL
FLUE DAMPER
INSULATION PAD MUST BE CUT IN
CENTER TO ACCOMMODATE VENT SIZE.
PLACE FOIL SIDE UP.
Figure 8H.1
Figure 8H.2
Roof Termination Without Optional
Mechanical Damper
Roof Termination With Optional
Mechanical Damper
OPTIONAL