®
Heat
Link
5
www.heatlink.com
SSPxx000x – SS Manifold Pump Panels
Installation, Operation, and Maintenance
Unpacking
Step 1 Examine carton for any damage that may have occurred during shipping. If damage is visible notify your courier and
supplier immediately.
Step 2 Open the carton by removing the strapping.
Step 3 Remove the cardboard spacers from the carton, then remove the panel from the carton. Lift the panel by the
enclosure, not the cover.
Step 4 Remove the cover from the panel by unlocking the coin/screwdriver locks. Lift the top of the cover upwards to
disengage the tongues from the slots at the bottom of the panel and then pull the cover off.
Step 5 Verify the following items:
• (2) 1" rubber washers (2 spares)
This panel is heavy; 2-3 person lift required.