®
Heat
Link
15
www.heatlink.com
SSPxx000x – SS Manifold Pump Panels
Installation, Operation, and Maintenance
Step 2
If electrical wiring will be coming from the top, remove the appropriate knockouts.
Recessed Enclosure Mounting
Step 1
Use a screwdriver or similar thin tool through the hole to bend the mounting tabs out 90 degrees
from the enclosure.
42-
1
⁄
2
"
7
⁄
8
" O.D.
7
⁄
8
" O.D.
2"
14-
13
⁄
16
"
27-
5
⁄
8
"
40-
1
⁄
2
"
2"
12-
3
⁄
16
"
22-
5
⁄
16
"
32-
7
⁄
16
"
34-
1
⁄
2
"
3-
3
⁄
4
"
3-
3
⁄
4
"
Step 3
Build a 2x6 supporting frame where the panel is to be mounted.
The panel should be mounted at least 12" above the floor.