46
24"
(60,9 cm)
24-3/8"
(61,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
24-3/8"
(61,9 cm)
5
PARTS REQUIRED:
10' x 10' ROOF PANELS
x10
2" (5,1 cm)
Maintain spacing between the center of the rafters
at the lower edge of the
48" x 96"
panel
(Fig. D)
.
Secure panels with (1) 2" nail into each rafter,
as shown.
Move to the top of the panel and keep spacing
between the center of the rafters.
Secure panels with (1) 2" nail into each rafter.
7/16 x 23-7/8 x 48"
(1,1 x 60,6 x 121,9 cm)
x1
Install (1)
23-7/8" x 48"
roof panel flush to the
installed panel and flush at peak
(Fig. B)
.
Secure panel with (1) 2" nail in each corner.
Move the gable end rafter edge until
it is 1/2" from the
23-7/8" x 48"
roof panel
(Fig. C)
.
Finish securing panel with (1) 2" nail
in each corner.
3
4
2" (5,1 cm) Nails
Fig. D
NOTE:
Measurements from inside of gable panels
Flush at
peak
Fig. B
1/2"
(1,2 cm)
Gable
End Rafter
Fig. C
Move Gab
le
Flush
2" nail
in each
corner
23-7/8"
x 47-
7/8"
Содержание STILLWATER