1st EAVE WALL 04 INSTALLATION
3" (7,6 cm)
x3
3" (7,6 cm)
x14
2
Place 1st 14' eave wall centered on floor.
1" (2,5 cm) overlap is to the bottom.
Install
OY
as a temporary brace, as shown.
Secure
OY
with (2) 3" screws.
Secure wall with (1) 2" screw into 10' wall
bottom plate
(Fig. A)
and top plate
(Fig. B)
.
Secure wall to bottom plate first.
BEGIN
1
Nail lower edge of panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Nail panel to 10' wall stud with
1-1/2" nails spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your 1st eave wall 04 is now installed.
FINISH
2" (5,1 cm)
x32
1-1/2" (3,8 cm)
x13
2" (5,1 cm)
x2
PARTS REQUIRED
2"
(5,1 cm)
Nails
1-1/2"
(3,8 cm)
Nails
Flush
6"
(15,2 cm)
6"
(15,2 cm)
2" (5,1 cm)
Screw
Fig. B
2"
(5,1 cm)
Screw
Fig. A
Secure wall top plate with (1) 3" screw
at the corner at an angle, as shown
(Fig. D)
.
3
3"
(7,6 cm)
Screw
Fig. D
3"
(7,6 cm)
Nails
OY
3"
(7,6 cm)
Screws
Nail 2" nails first.
2"
(5,1 cm)
Nails
Fig. C
3"
(7,6 cm)
Nails
x1
2 x 3 x 72" (5,1 x 7,6 x 182,9 cm)
OY
Temporary Brace