
50
24-3/8"
(62,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
24-3/8"
(62,9 cm)
24"
(60,9 cm)
24"
(60,9 cm)
1/2"
(1,2 cm)
Gable
End Rafter
Fig. C
Install
47-7/8" x 48"
roof panel
flush to the installed panel and
flush at the peak
(Fig. B)
.
Secure panel with (1) 2" nail
in each corner.
Move to the opposite end.
Using the unattached end of
the panel as a lever, move the panel
side-to-side until the top corner is flush
to the peak
(Fig. B)
and there is a 3/4"
measurement on the rafter
(Fig A)
.
Secure panel with (1) 2" nail in each corner.
Install
23-7/8" x 48"
roof panel flush to
the installed panel and flush at the peak
(Fig. B)
. Secure panel with (1) 2" nail in
each corner.
Move gable end rafter edge until it is
1/2" from the
23-7/8" x 48"
roof panel
(Fig. C)
.
Finish securing panel with (1) 2" nail
in each corner.
3
4
5
PARTS REQUIRED:
10' x 14' ROOF PANELS
x16
2" (5,1 cm)
Fig. D
Maintain spacing between the center of the rafters at the lower edge of the panels
(Fig. D)
.
Secure panels with (1) 2" nail into each rafter, as shown.
Move to the top of the panel and keep spacing between the center of the rafters.
Secure panels with (1) 2" nail into each rafter.
47-7/8 x 48"
(121,6 x 121,9 cm)
x1
23-7/8 x 48"
(121,6 x 121,9 cm)
x1
NOTE:
Measurements from inside of gable panels
Move Gab
le
23-7/8
" x
48"
47-7/8
" x
48"
Flush
Flush
Flush at
peak
Fig. B
2" nail
in each
corner
3/4"
(1,9 cm)
Gauge Block
Fig. A
2" (5,1 cm) Nails
Содержание STILLWATER
Страница 2: ... This page intentionally left blank ...