PARTS REQUIRED:
2nd EAVE WALL 03 INSTALLATION
3" (7,6 cm)
x1
3" (7,6 cm)
x10
2" (5,1 cm)
x23
4
Nail 10' eave wall panel to 10' gable wall
stud with 1-1/2" nails spaced 6" apart.
Your 2nd eave wall 03 is now installed.
FINISH
3"
(7,6 cm)
Nails
1-1/2" (3,8 cm)
x13
Secure wall top plate with (1) 3" screw at the
corner at an angle as shown
(Fig. D)
.
5
3
Nail lower edge of wall panels
to floor frame with 2" nails
spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Secure wall bottom plates to floor
with 3" nails
(Fig. C)
.
1-1/2"
(3,8 cm)
Nails
6"
(15,2 cm)
3"
(7,6 cm)
Screw
Fig. D
6"
(15,2 cm)
Secure wall with (1) 2" screw through
gable wall panel into 10' wall bottom
and top plates
(Fig. B, Fig. A)
.
Secure wall to bottom plate first.
ENSURE PANEL CORNERS ARE FLUSH.
2
BEGIN
1
Remove temporary brace
OO
from installed 10' gable wall.
Place 2nd 10' eave wall centered on floor.
1" (2,5 cm) overlap is to the bottom.
Nail 2" nails first.
2"
(5,1 cm)
Nails
3"
(7,6 cm)
Nails
Fig. C
Flush
2"
(5,1 cm)
Screw
Fig. B
Fig. A
2"
(5,1 cm)
Screw
2" (5,1 cm)
x2