Burner
IMPORTANT: ENSURE THAT THE LOUVERED BASE
PLATE IS IN POSITION DURING COMBUSTION
TESTING AND SETTING PROCEDURES. ENSURE
THE OUTER DOOR IS CLOSED.
TURN THE BURNER ON
After 15 minutes, lift up the R.H. insulating cover and
remove the countersunk screw and insert the sensing end
of a portable indicator to check the CO
2
(Carbon Dioxide)
level.
CO
0 - 50 ppm
CO
2
8.2% - 9.9%
If these values cannot be obtained, check gas rate, adjust
throttle screw if required and allow readings to stabilize
(See Fig. 21).
COMBUSTION AIR
FIG. 21
DESN 512341
THROTTLE
ADJUSTMENT SCREW
39