ECO CHOICE PELLET STOVE SERVICE MANUAL
POWER SUPPLY TESTING
5
12
JUNCTION BOX
TO CHECK FOR CONTINUITY:
1) PUT A JUMPER WIRE ON THE END OF THE POWER
CORD. (SEE FIGURE 5)
2) SET THE VOLT METER TO OHMS AND PUT THE
PROBES ON PIN 5 & PIN 12. (SEE FIGURE 4)
IF THE CIRCUIT IS COMPLETE, THE READING
SHOULD BE “0”.
JUMPER WIRE
FIGURE 5
FIGURE 4
FIGURE 2
BLACK WIRE
GREY WIRE
7 AMP FUSE HOLDER
CHECK FOR POWER ON BOTH SIDES.
THERMOSTAT
BLOCK
POWER CORD
FIGURE 1
BLACK
WHITE
FIGURE 3
#3 SNAP DISC
PAGE 15
GREEN