Harvia WHP1500 Скачать руководство пользователя страница 8

8

EN

RU

5. Installing the rain cap

Slot in the damper with the smoke 

pipe of the lower module. Lock the 

rain cap in place by gently turning 

it clockwise.

NOTE! Be careful not to turn and 

lock the rain cap too tight! The cap 

needs to be removed for chimney 

sweeping.

6. Installing the lead-through flange

The two-piece lead-through 

flange fixed in horizontal or 

pitched ceilings trims the edges 

of the opening. The lead-through 

flange is best suited for roof 

pitches of under 1:1.5.

A. Install the two halves of the 

flange around the chimney. The 

straighter the roof, the more the 

components will overlap. 

B. Fix the lead-through flange 

in place with screws. Be careful 

and tighten the screws only so 

much as not to bend the metal 

sheet.

5. Óñòàíîâêà îãîëîâêà äûìîõîäà

6. Óñòàíîâêà ïðîõîäíîãî ôëàíöà

Ïàçû îãîëîâêà äûìîõîäà ïîäãîíÿþòñÿ 
ïîä øèïû âíóòðåííåé ÷àñòè ýëåìåíòà, 
íàõîäÿùåãîñÿ âíèçó. Îãîëîâîê 
äûìîõîäà çàêðåïëÿåòñÿ ëåãêèì 
ïîâîðîòîì ïî ÷àñîâîé ñòðåëêå.

ÂÍÈÌÀÍÈÅ! Íå ðåêîìåíäóåòñÿ 

çàòÿãèâàòü îãîëîâîê äûìîõîäà 
ñëèøêîì ïëîòíî. Åãî íåîáõîäèìî 
óäàëÿòü âî âðåìÿ ïðî÷èñòêè 
òðóáû äûìîõîäà.

Ñîñòîÿùèé èç 2-õ ÷àñòåé ïðîõîäíîé 
ôëàíåö, óñòàíàâëèâàåìûé íà 
ãîðèçîíòàëüíûõ è íàêëîííûõ 
ïîòîëêàõ, ïðèäàåò àêêóðàòíûé âèä 
êðàÿì îòâåðñòèÿ.Ïðîõîäíîé ôëàíåö 
ëó÷øå âñåãî ïîäõîäèò äëÿ êðîâåëü ñ 
íàêëîíîì 1:1,5.

A. Ïîëîâèíêè ôëàíöà 
óñòàíàâëèâàþòñÿ âîêðóã òðóáû 
äûìîõîäà. ×åì ìåíüøå íàêëîí 
ñêàòà, òåì áîëüøå íàëîæåíèå 
äåòàëåé ïðîõîäíîãî ôëàíöà. 

B. Ïðîõîäíîé ôëàíåö êðåïèòñÿ 
ïî ìåñòó íà øóðóïàõ. Øóðóïû 
ðåêîìåíäóåòñÿ çàòÿãèâàòü 
îñòîðîæíî, ÷òîáû èçáåæàòü 
ïîâðåæäåíèÿ æåñòè ôëàíöà.

A

B

Содержание WHP1500

Страница 1: ...07032006H Instructions for installation of Steel Chimney Steel Chimney EN RU Harvia Oy PL12 40951 Muurame Finland www harvia fi...

Страница 2: ...Standard delivery Steel Chimney extensions WHP500 Length 0 5 m Length of isolated component 470 mm 0 5 470 Steel Chimney 1 5 m 1 5 Smoke pipe 1 0 m stainless steel 1 0 Lead through flange Note Extens...

Страница 3: ...el Chimney 6 4 Installing the rain flange 7 5 Installing the rain cap 8 6 Installing the lead through flange 8 1 4 2 5 3 6 4 7 5 8 6 8 EN RU 0809 Harvia Oy PL 12 40951 Muurame Finland 06 0809 CPD 0548...

Страница 4: ...ere is no need for protection if the chimney is installed in a sauna The chimney shouldn t be encapsulated The maximum height of the steel chimney is five metres while the permissible maximum for the...

Страница 5: ...nces from the mounting instructions In case the protective distance requirements for the furnace are higher than for the chimney the distance can be reduced by installing non flammable protective plat...

Страница 6: ...nwards in the pipe E Lock the outer casing in place with three self boring screws Bore the screws through the metal sockets F Join the upper end with three self boring screws Bore the screws through t...

Страница 7: ...e chimney on the surface of the roof Soap solution can be used as a lubricant if needed C Mould the brims of the rain flange carefully fitting it to the roof profile D Spread some silicone underneath...

Страница 8: ...ng the lead through flange The two piece lead through flange fixed in horizontal or pitched ceilings trims the edges of the opening The lead through flange is best suited for roof pitches of under 1 1...

Отзывы: