Harvia WHP1500 Скачать руководство пользователя страница 7

7

EN

RU

4. Installing the rain flange

The rubber rain flange prevents water and snow 

entering through the chimney lead-through hole. 

If the profile of the roofing material is very high 

or brick is used, an integral, uniform and stiffened 

metal sheet covering the chimney hole should be 

installed. This ensures the flange is fixed firmly in 

the damper.

A. Cut an opening in the rain 

flange with the diameter of 175-

180 mm i.e. approx. 20 % less 

than the chimney diameter.

B. Mount the flange from the 

upper end of the chimney on 

the surface of the roof. Soap 

solution can be used as a 

lubricant if needed.

C. Mould the brims of the rain 

flange carefully fitting it to the 

roof profile.

D. Spread some silicone 

underneath the flange and press 

the flange into place on the roof 

covering. Smooth out the excess 

silicone against the edge of the 

rain flange.

E. Fix the flange to the damper 

with screws. The recommended 

spacing is max. 35 mm. Finally 

check that there are no gaps in 

the sealing. 

NOTE! A special snow barrier is 

needed to prevent snow from 

sliding against the rain flange. The 

amassed snow should be removed 

occasionally thus preventing the 

snow accumulating and clumping 

on the flange.

A

E

B

C

D

Äîæäåâîé ôëàíåö èç ðåçèíû ïðåïÿòñòâóåò 
ïðîíèêíîâåíèþ äîæäåâîé âîäû è ñíåãà ñêâîçü ïðîõîä 
äûìîõîäà. Åñëè êðîâåëüíîå ïîêðûòèå èìååò âûñîêèé 
ïðîôèëü, ëèáî â êà÷åñòâå êðîâåëüíîãî ìàòåðèàëà 
èñïîëüçîâàíà ÷åðåïèöà, â òàêîì ñëó÷àå ñ êîíüêà êðûøè 
íåîáõîäèìî óñòàíîâèòü ðîâíûé ëèñò æåñòêîé æåñòè, 
çàõîäÿùèé çà îòâåðñòèå äûìîõîäà. Ýòî ïîçâîëèò 
ïðî÷íî çàêðåïèòü äîæäåâîé ôëàíåö íà îñíîâàíèè. 

A. Â îòâåðñòèè äîæäåâîãî ôëàíöà 
ïðîðåçàåòñÿ îòâåðñòèå äèàìåòðîì 
îêîëî 175-180 ìì, òî åñòü 
ïðèìåðíî íà 20 % ìåíüøå äèàìåòðà 
äûìîõîäà.

B. Äîæäåâîé ôëàíåö ïðîòÿãèâàåòñÿ 
ñêâîçü îòâåðñòèå ïî òðóáå äûìîõîäà 
è ïðèæèìàåòñÿ ê ïîâåðõíîñòè 
êðûøè. Äëÿ óìåíüøåíèÿ òðåíèÿ ïðè 
ïðîòÿãèâàíèè ìîæíî èñïîëüçîâàòü, 
íàïðèìåð, ìûëüíûé ðàñòâîð.

C. Êðàÿ äîæäåâîãî ôëàíöà 
òùàòåëüíî ïîäãîíÿþòñÿ ïîä 
ïðîôèëü êðîâëè.

D. Íà íèæíþþ ÷àñòü äîæäåâîãî 
ôëàíöà íàíîñèòñÿ ñèëèêîí, è 
ôëàíåö ïëîòíî ïðèæèìàåòñÿ 
íà ìåñòî, ê ïîâåðõíîñòè êðîâëè.  
Ëèøíèé ñèëèêîí, âûäàâëåííûé 
èç-ïîä ôëàíöà, ðàçðàâíèâàåòñÿ ïî 
êðàþ.

E. Ôëàíåö êðåïèòñÿ øóðóïàìè ê 
îñíîâàíèþ. Ðåêîìåíäóåìûé øàã 
ìåæäó øóðóïàìè íå ïðåâûøàåò 35 
ìì. Íå çàáóäüòå ïðîâåðèòü, ÷òî â 
óïëîòíèòåëå íå îñòàëîñü ùåëåé. 

ÂÍÈÌÀÍÈÅ! Äîæäåâîé ôëàíåö 
íåîáõîäèìî çàùèòèòü ñíåãîâûì 
áàðüåðîì îò ñêîïëåíèé ñíåãà. 
Åñëè çèìà îñîáåííî ñíåæíàÿ, 
ðåêîìåíäóåòñÿ óäàëÿòü âðåìÿ 
îò âðåìåíè ñíåã îò îñíîâàíèÿ 
äûìîõîäà, íå äîïóñêàÿ åãî 
ñêîïëåíèÿ íà äîæäåâîì 
ôëàíöå.

4. Óñòàíîâêà äîæäåâîãî ôëàíöà

Содержание WHP1500

Страница 1: ...07032006H Instructions for installation of Steel Chimney Steel Chimney EN RU Harvia Oy PL12 40951 Muurame Finland www harvia fi...

Страница 2: ...Standard delivery Steel Chimney extensions WHP500 Length 0 5 m Length of isolated component 470 mm 0 5 470 Steel Chimney 1 5 m 1 5 Smoke pipe 1 0 m stainless steel 1 0 Lead through flange Note Extens...

Страница 3: ...el Chimney 6 4 Installing the rain flange 7 5 Installing the rain cap 8 6 Installing the lead through flange 8 1 4 2 5 3 6 4 7 5 8 6 8 EN RU 0809 Harvia Oy PL 12 40951 Muurame Finland 06 0809 CPD 0548...

Страница 4: ...ere is no need for protection if the chimney is installed in a sauna The chimney shouldn t be encapsulated The maximum height of the steel chimney is five metres while the permissible maximum for the...

Страница 5: ...nces from the mounting instructions In case the protective distance requirements for the furnace are higher than for the chimney the distance can be reduced by installing non flammable protective plat...

Страница 6: ...nwards in the pipe E Lock the outer casing in place with three self boring screws Bore the screws through the metal sockets F Join the upper end with three self boring screws Bore the screws through t...

Страница 7: ...e chimney on the surface of the roof Soap solution can be used as a lubricant if needed C Mould the brims of the rain flange carefully fitting it to the roof profile D Spread some silicone underneath...

Страница 8: ...ng the lead through flange The two piece lead through flange fixed in horizontal or pitched ceilings trims the edges of the opening The lead through flange is best suited for roof pitches of under 1 1...

Отзывы: