
52
G
ENERAL
M
AINTENANCE
Warning
Burn Hazard: Door may be hot. Be
sure that unit has cooled before
performing this procedure.
Months Until Replacement Calculation
Values Needed:
1.
Assign proper values to c, D and T.
c = no. of cycles/workday (operator defined)
D = no. of workdays/week (operator defined)
T = Total no. of cycles before filter needs
replacement (see chart below).
Total Cycles Before Replacement (T)
Model
EC5500
EC6000
Total Cycles (T)
500
250
Calculation:
2.
Insert the values for c, D and T into the
formula:
no. of months until replacement = 0.231 x (T/[c
x D])
Example:
A. An operator has an EC5500 sterilizer. She
intends to run it 7 cycles each day, 4 days/
week.
How soon must she replace the Chemi-Filter?
Solution:
c = 7, D = 4 and T = 500. Substituting into the
formula, we get:
0.230 x (500/[7 x 4]) = 4.125
Replace the Chemi-Filter after 4 months.
Replacing the Door Gasket
Replace the door gasket at least once a year.
1.
Open the door. Use a blunt instrument to lift it
from the gasket groove.
2.
Remove the gasket from the gasket groove in
the rim of the chamber.
3.
Clean the gasket groove and sealing surface
so that it is free of dirt or of deposits.
Содержание Chemiclave EC5500
Страница 15: ...15 Figure 4 Metering Valve Function PRINCIPLES OF OPERATION ...
Страница 16: ...16 Figure 7 Pressurization PRINCIPLES OF OPERATION Figure 6 Ready Load Figure 5 Warm Up ...
Страница 17: ...17 Figure 8 EC5500 EC6000 Operation PRINCIPLES OF OPERATION ...
Страница 18: ...18 Figure 11 End Unload Figure 10 Purge Figure 9 Exposure PRINCIPLES OF OPERATION ...
Страница 20: ...20 Figure 13 Piping Schematic PRINCIPLES OF OPERATION ...
Страница 21: ...21 Figure 14 Cycle Phase Diagram PRINCIPLES OF OPERATION ...
Страница 22: ...22 Door Gasket Figure 15 Exploded View Top Cover and Door PRINCIPLES OF OPERATION ...
Страница 32: ...32 MAINTENANCE AND SERVICING Figure 17 Metering Valve need new drawing ...
Страница 39: ...39 MAINTENANCE AND SERVICING Figure 22 Power Supply Printed Circuit Board ...
Страница 56: ...56 ...