
38
Testing the Printed Circuit Boards (PCBs)
1.
Check for voltage to Power Supply Board.
•
Set the probes of a DC voltmeter across test points TP1 and TP2 (see Figure 22).
•
Check for 5 VDC
±
0.25V.
•
If voltage does not check out, check for F102 fuse blown. Also check that the jumpers are properly
configured.
•
If voltage still does not check out, replace the board.
2.
Check for power to the Display/Control Board.
•
Set the probes of a DC voltmeter across test points TP1 and TP2 (see Figure 23).
•
Check for 5 VDC
±
0.25V.
•
If voltage does not check out, replace the cable.
•
If voltage does check out, but board does not function, replace the board.
M
AINTENANCE
AND
S
ERVICING
Troubleshooting PCBs
m
e
l
b
o
r
P
e
s
u
a
C
y
d
e
m
e
R
n
o
n
w
o
l
b
e
s
u
f
2
0
1
F
.
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
,
V
5
1
1
r
o
f
d
e
r
u
g
if
n
o
c
.
e
n
il
V
0
3
2
o
t
d
e
t
c
e
n
n
o
c
.
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
n
o
n
o
it
a
r
u
g
if
n
o
c
r
e
w
o
p
k
c
e
h
C
.
d
e
ri
u
q
e
r
fi
e
g
n
a
h
C
r
o
p
u
r
e
w
o
p
t
o
n
ll
i
w
ti
n
U
.
y
a
l
p
s
i
d
c
it
a
r
r
e
s
w
o
h
s
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
,
V
0
3
2
r
o
f
d
e
r
u
g
if
n
o
c
.
e
n
il
V
5
1
1
o
t
d
e
t
c
e
n
n
o
c
.
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
n
o
n
o
it
a
r
u
g
if
n
o
c
r
e
w
o
p
k
c
e
h
C
.
d
e
ri
u
q
e
r
fi
e
g
n
a
h
C
d
r
a
o
B
l
o
rt
n
o
C
/
y
a
l
p
s
i
D
C
D
V
5
w
o
h
s
t
o
n
s
e
o
d
.
s
t
n
i
o
p
t
s
e
t
s
s
o
r
c
a
t
o
n
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
.
d
e
r
u
g
if
n
o
c
.
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
n
o
n
o
it
a
r
u
g
if
n
o
c
r
e
w
o
p
k
c
e
h
C
.
d
e
ri
u
q
e
r
fi
e
g
n
a
h
C
r
e
w
o
P
n
o
n
w
o
l
b
2
0
1
F
e
s
u
F
.
d
r
a
o
B
y
l
p
p
u
S
.
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
n
o
n
o
it
a
r
u
g
if
n
o
c
r
e
w
o
p
k
c
e
h
C
.
d
e
ri
u
q
e
r
fi
e
g
n
a
h
C
d
r
a
o
B
l
o
rt
n
o
C
/
y
a
l
p
s
i
D
C
D
V
5
w
o
h
s
t
o
n
s
e
o
d
.
s
t
n
i
o
p
t
s
e
t
s
s
o
r
c
a
t
o
n
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
.
d
e
r
u
g
if
n
o
c
.
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
n
o
n
o
it
a
r
u
g
if
n
o
c
r
e
w
o
p
k
c
e
h
C
.
d
e
ri
u
q
e
r
fi
e
g
n
a
h
C
r
e
w
o
P
n
o
n
w
o
l
b
2
0
1
F
e
s
u
F
.
d
r
a
o
B
y
l
p
p
u
S
.
A
2
d
r
a
o
B
y
l
p
p
p
u
S
r
e
w
o
P
e
c
a
l
p
e
R
s
w
o
h
s
d
r
a
o
B
y
l
p
p
u
S
r
e
w
o
P
fI
l
o
rt
n
o
C
/
y
a
l
p
s
i
D
t
u
b
C
D
V
5
d
a
b
:t
o
n
s
e
o
d
d
r
a
o
B
.
e
l
b
a
c
g
n
it
c
e
n
n
o
c
.
e
l
b
a
c
e
c
a
l
p
e
R
C
D
V
5
w
o
h
s
s
d
r
a
o
b
h
t
o
b
fI
d
r
a
o
b
l
o
rt
n
o
C
/
y
a
l
p
s
i
D
t
u
b
d
a
b
,
n
o
it
c
n
u
f
t
o
n
s
e
o
d
.
d
r
a
o
B
l
o
rt
n
o
C
/
y
a
l
p
s
i
D
.
d
r
a
o
B
l
o
rt
n
o
C
/
y
a
l
p
s
i
D
e
c
a
l
p
e
R
r
o
p
u
t
a
e
h
h
ti
w
s
m
e
l
b
o
r
P
.
g
n
i
m
it
e
s
a
h
p
e
l
c
y
c
d
r
a
o
B
l
o
rt
n
o
C
/
y
a
l
p
s
i
D
.t
c
e
r
r
o
c
n
i
s
r
e
p
m
u
j
.
n
o
it
a
r
u
g
if
n
o
c
r
e
p
m
u
j
t
c
e
r
r
o
c
d
n
a
k
c
e
h
C
Содержание Chemiclave EC5500
Страница 15: ...15 Figure 4 Metering Valve Function PRINCIPLES OF OPERATION ...
Страница 16: ...16 Figure 7 Pressurization PRINCIPLES OF OPERATION Figure 6 Ready Load Figure 5 Warm Up ...
Страница 17: ...17 Figure 8 EC5500 EC6000 Operation PRINCIPLES OF OPERATION ...
Страница 18: ...18 Figure 11 End Unload Figure 10 Purge Figure 9 Exposure PRINCIPLES OF OPERATION ...
Страница 20: ...20 Figure 13 Piping Schematic PRINCIPLES OF OPERATION ...
Страница 21: ...21 Figure 14 Cycle Phase Diagram PRINCIPLES OF OPERATION ...
Страница 22: ...22 Door Gasket Figure 15 Exploded View Top Cover and Door PRINCIPLES OF OPERATION ...
Страница 32: ...32 MAINTENANCE AND SERVICING Figure 17 Metering Valve need new drawing ...
Страница 39: ...39 MAINTENANCE AND SERVICING Figure 22 Power Supply Printed Circuit Board ...
Страница 56: ...56 ...