
46
Warning
Shock Hazard. Make sure unit is
disconnected from power source.
M
AINTENANCE
AND
S
ERVICING
Check Valve
If the unit does not maintain pressure during operation, the
check valve may not be seated properly. To reseat the
check Valve:
1.
Run the unit in Purge for one minute to loosen
the check valve ball.
2.
Run a test cycle. It should reseat the check valve
ball.
3.
If the check valve continues to leak under
pressure, replace it (see Figure 12).
Electrical Components
Fuses
If the control panel does not activate when Power Switch is
ON, check the fuse cartridges. If a fuse is blown, replace it
with another of the same rating.
Model
Fuse
Code
Part No.
EC5500
100V, 12A, Time Lag
T
5120-0036
115V, 10A, Time Lag
T
261575
230V, 7A, Time Lag
T
440-0020
EC6000
115V, 15A, Time Lag
T
264305
110V, 15A, Time Lag
T
264305
230V, 8A, Time Lag
T
FZX67
Fuse Replacement
1.
Disconnect unit from power supply.
2.
Remove unit cover.
3.
Remove the fuse.
4.
Check the fuse with an ohmmeter. Replace fuse
if necessary.
5.
Reinstall fuse.
6.
Replace the unit cover.
7.
Reconnect unit to power supply.
Содержание Chemiclave EC5500
Страница 15: ...15 Figure 4 Metering Valve Function PRINCIPLES OF OPERATION ...
Страница 16: ...16 Figure 7 Pressurization PRINCIPLES OF OPERATION Figure 6 Ready Load Figure 5 Warm Up ...
Страница 17: ...17 Figure 8 EC5500 EC6000 Operation PRINCIPLES OF OPERATION ...
Страница 18: ...18 Figure 11 End Unload Figure 10 Purge Figure 9 Exposure PRINCIPLES OF OPERATION ...
Страница 20: ...20 Figure 13 Piping Schematic PRINCIPLES OF OPERATION ...
Страница 21: ...21 Figure 14 Cycle Phase Diagram PRINCIPLES OF OPERATION ...
Страница 22: ...22 Door Gasket Figure 15 Exploded View Top Cover and Door PRINCIPLES OF OPERATION ...
Страница 32: ...32 MAINTENANCE AND SERVICING Figure 17 Metering Valve need new drawing ...
Страница 39: ...39 MAINTENANCE AND SERVICING Figure 22 Power Supply Printed Circuit Board ...
Страница 56: ...56 ...