
37
M
AINTENANCE
AND
S
ERVICING
Fuse Replacement
1.
Disconnect unit from power supply.
2.
Remove unit cover.
3.
Remove the fuse.
4.
Check the fuse with an ohmmeter. Replace fuse
if necessary.
5.
Reinstall fuse.
6.
Replace the unit cover.
7.
Reconnect unit to power supply.
Printed Circuit Boards (PCBs)
There are printed circuit boards:
•
Power Supply Board
•
Display/Control Board
Power Supply Board
(See Figure 22)
•
Can be configured for 115V or 230V.
•
Hard-wired fuse F102:
100 mA, 5 x 29 mm, with leads, UL 198 G, UL
Listed, CSA certified.
SANO part no. SD5—100mA, 250V or Wickman
part no. 19898-027-LO.
Display/Control Board
(See Figure 23)
JUMPERS
Jumper Frequency Rating
60 Hz
50 Hz
JP1
IN
OUT
Jumper
Model
EC5500
EC6000
7-min purge
9-min purge
JP2
IN
OUT
JP3
OUT
IN
Содержание Chemiclave EC5500
Страница 15: ...15 Figure 4 Metering Valve Function PRINCIPLES OF OPERATION ...
Страница 16: ...16 Figure 7 Pressurization PRINCIPLES OF OPERATION Figure 6 Ready Load Figure 5 Warm Up ...
Страница 17: ...17 Figure 8 EC5500 EC6000 Operation PRINCIPLES OF OPERATION ...
Страница 18: ...18 Figure 11 End Unload Figure 10 Purge Figure 9 Exposure PRINCIPLES OF OPERATION ...
Страница 20: ...20 Figure 13 Piping Schematic PRINCIPLES OF OPERATION ...
Страница 21: ...21 Figure 14 Cycle Phase Diagram PRINCIPLES OF OPERATION ...
Страница 22: ...22 Door Gasket Figure 15 Exploded View Top Cover and Door PRINCIPLES OF OPERATION ...
Страница 32: ...32 MAINTENANCE AND SERVICING Figure 17 Metering Valve need new drawing ...
Страница 39: ...39 MAINTENANCE AND SERVICING Figure 22 Power Supply Printed Circuit Board ...
Страница 56: ...56 ...