background image

- 13 -

V3-10-10

 Assembly instructions terrace awning TR850

G.   Finishing & Maintenance

G.1. Finishing

If the sun blind is to be fitted with a storm bar, lower the drop bar by 
about 15 cm. Remove the closing plate at the upper end of the guide 
rails. Then take the storm bar supplied out of its packaging and carefully 
press the runner down into the guide rails. Make sure the magnets are 
pointing forwards and are able to touch the metal plate. The blind will 
then run through under the storm bar. Refit the closing plate in the cor-
rect position. Then place a stop in the middle of the inside of the guide 
rails at both ends.
This stop must catch the projection on the runner, but must always allow 
the drop bar to pass. If the motor has been fully adjusted, the lid of 
the casing can be replaced. For wide sun blinds an extra support is 
provided in the middle of the casing to fasten the lid.

-  If a number of sun blinds are placed next to each other it is advis-

able to connect the vertical guide rails together. For this, use the 
connecting strips supplied, and clip them to the rails immediately 
below the corner.

-  To prevent sideways movement of the guide rails measures must be 

taken to ensure lateral stability. Try to make a connection to some 
other element which will provide lateral support, such as a wall or a 
diagonal stiffener on the ground.

-  To avoid entry of rain, run-offs can also be fitted under the guide 

rails. These run-offs should be fitted using small plates with an M6 screw thread and suspension 
brackets.

Important notice: please do apply the following guidelines very strictly!

1. Fix the suspension brackets to the bottom of the lateral guides ( 1 per 1,2m ).
2.  Drill a hole through the gutter and the brackets with a diam. 3mm. Fix the gutter to the side of the 

brackets with a parker-screw

3.  Position the clip of the drainpipe between the lateral guides ( these clips are not included and can be 

purchased at the DIY ). For an optimal fastening of the outlet basket, the axis of the pipe has to have 
a spacing of exactly 28 mm.  ( see fig.)

4. Attach the drainpipe to the clips ( the drainpipe is not included and can be purchased at the DIY ).
5.  Install the outlet basket with its outlet opening into the drainpipe. Fix the outlet basket to backside 

of the lateral guides with a screw and a small plate into the slot holes.

fig. 26: Magnets

fig. 27: Stop

Содержание TR850

Страница 1: ...Assembly instructions Terrace awning TR850 art nr 6837...

Страница 2: ...r apprentice fitters Before you start please do read these instructions thoroughly The tightening of springs creates important powers Be very careful and make sure of a solid footing whilst operating...

Страница 3: ...The casing is secured to the wall at each end by hinge pieces Mark the drilling holes on the walls Check the exact distance between the fixing points Proceed as follows First mark out the width of the...

Страница 4: ...h the casing fig 5 2 For mounting on the ceiling a mounting clip can be added if necessary 3 For walls in poor condition it is recom mended to select the most suitable fixings for each individual case...

Страница 5: ...of the guide rail over the internal pulley fig 8A Let the fabric bar exit at the other end of the rail B Slip the end of the cable B through the opening in the fabric bar Now pull the cable forwards...

Страница 6: ...can no longer be pulled out of the rail Drill a hole through the guide rail in to the pin of the cover in the position indicated and fix the cover with a parker screw fig 7 Now remove from the packagi...

Страница 7: ...these must be kept even and the position of the rollers must be identical at left and right Now take a spirit level and a ruler and position the base supports perfectly vertical and at their correct d...

Страница 8: ...erly throughout Then hook the left hand plate with a pulley to the springs Fasten the claw of the cable tensioning device around the plate Set the springs to tension fig 19 Pull using the cable tensio...

Страница 9: ...places over the spring as a temporary measure Leave these pieces of clip section in place temporarily during adjustment of the blind In this way it is very easy to check the position of the spring and...

Страница 10: ...s used must be in accordance with the existing norms and requirements Connecting the single pole switch and adjusting the motor Connect the motor with a test cable first E 1 Single pole switch Connect...

Страница 11: ...itself Let the awning unroll until you have reached the desired end position Turn the switch of the test cable into its zero position Now you push the white or the yellow button on the motor head dep...

Страница 12: ...is desired to operate the sun blind using a single switch it is necessary to use a relay box If this is not done the system will oscillate and the high inductive and capacitative voltages created will...

Страница 13: ...ils immediately below the corner To prevent sideways movement of the guide rails measures must be taken to ensure lateral stability Try to make a connection to some other element which will provide la...

Страница 14: ...lt of the dirt which is always in the air the fabric and the rails will certainly become dirty after a certain time These particles of dirt may settle in the groove ahead of the runners Accumula tions...

Страница 15: ...e Faulty adjustment of limit switches see p 4 Internal flap not straight Guide rails are parallel but not square to the casing Check by applying Pythagoras rule 3 4 5 or measuring diagonals 5 Internal...

Страница 16: ......

Отзывы: