9.1.
Pump pit
The pump pit and any connection control pit and, where applicable, further control pits, must be stable, clean
and dry.
Procedure
- Seal any gaps and cut-outs.
- Insert into the pit the inlet pipe with the curved inlet and the plastic pipe for the cables. Cut-outs must be
sealed to a professional standard.
- The pump pit must be placed as close to the house as possible to ensure that it can be accessed in any
weather without any field damage (e.g. garage entrance). For the purpose of easy cleaning, a water con
-
nection should be situated in the vicinity of the pit.
- In case the system features a connection control pit, its floor must be designed in such a way that water
can drain off easily. The pressure line must protrude into the pit by approximately 0.3 m.
Содержание ECONEX 2402
Страница 2: ......
Страница 42: ...42 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 D A B C F D E G H I L M P N O Q R S T U...
Страница 84: ...84 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 F A B C F D E G H I L M P N O Q R S T U...
Страница 122: ...122 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 I 14 1 9 Ecocut 2406 2 stadi in serie 2406 KY AE W W W W...
Страница 126: ...126 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 I A B C F D E G H I L M P N O Q R S T U...
Страница 164: ...164 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 GB 14 1 9 Ecocut 2406 2 stage in series 2406 KY AE W W W W...
Страница 168: ...168 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 GB A B C F D E G H I L M P N O Q R S T U...
Страница 181: ...181 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 BG 2 2 1...
Страница 182: ...182 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 BG 2 2 H ny 2 3 10 H ny AG 2 4 8 3 3 1 5 3 2...
Страница 188: ...188 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 BG TLT04112013 00 9 1 0 3 m...
Страница 189: ...189 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 BG 9 2 3 9 3 100 cm 100 cm 3 9 4...
Страница 196: ...196 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 BG 12 12 1 5 10 12 2 31 12 3 3...
Страница 197: ...197 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 BG 13 104 51 52...
Страница 206: ...206 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 BG 14 1 9 Ecocut 2406 2 2406 KY AE W W W W...
Страница 209: ...209 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 BG 15 T 16 15 Nm 1 2 3 U 4 5 6 7...
Страница 219: ...219 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022...
Страница 220: ...220 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022...
Страница 221: ...221 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022...
Страница 223: ...223 226 14 6 14 6 Notes 14 6 Appunti 14 6 Notes ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022 14 6 Notizen...
Страница 224: ...224 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022...
Страница 225: ...225 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022...
Страница 226: ...226 226 ECONEX ECOCUT ECOVOX PM1 101274 VERSION 06 15 02 2022...
Страница 227: ......