-18-
OPERATION
UNLOADING/DUMPING THE WAGON
1. When dumping into a truck, or other receiving vehicle, choose a level area, free of obstructions.
2. With the operator in the tractor seat, and all others well clear of the
2X
, actuate the “LIFT” hydraulic
control valves of the boxes to raise to the desired dumping height.
3.
When the desired dumping height has been reached, actuate the “TILT/DUMP” hydraulic control valves
to dump the boxes.
4.
After the load is dumped, or the desired amount has been dumped, reverse the control valves to bring
the box back to the upright position.
5. Reverse the control valves for the lift cylinders to return the boxes to the transport position.
6. The entire dumping cycle should take approximately two to three minutes depending on hydraulic
supply output.
CAUTION:
• Never move the wagon when the box is raised. This will cause extreme stress on the structural
members and may cause failure.
SERVICE
TRACKS
Note: Check the track alignment daily or every 10 hours of road operation
for proper track alignment.
Note: Minimum turning radius 1.5 X the overall length of the tractor plus
implement.
See the supplied Track Manufacturers Operator’s Manual for service and adjustments.
Following is the color to the fuction of the hydraulic hoses.
• (G) Gray - Rear Tank Lift Cylinders
• (B) Black - Front Tank Lift Cylinders
• (Y) Yellow - Rear Tank Tilt Cylinders
• (T) Tan - Front Tank Tilt Cylinders
• (R) Red - Hydraulic Jack
G
B
Y
T
R
Содержание LOADMASTER 2X
Страница 6: ... 4 Intentionally Left Blank ...
Страница 8: ... 6 Intentionally Left Blank ...
Страница 10: ... 8 Intentionally Left Blank ...
Страница 13: ... 11 SAFETY INFORMATION ...
Страница 16: ... 14 HYDRAULIC FITTING TORQUE SPECIFICATIONS ...
Страница 17: ... 15 HYDRAULIC FITTING TORQUE SPECIFICATIONS ...
Страница 23: ... 21 LUBRICATION GUIDE Cylinder Pin 1 Upper Rollers 2 Cylinder Pin 2 Cylinder Pin 1 ...
Страница 32: ... 30 SERVICE NOTES ...
Страница 33: ......