HAMWORTHY HEATING LTD
6
FLEET H series
500001212/F
Figure 3.2.1 – Single boiler installation
Figure 3.2.2 – Two boiler installation
Side view Rear view
Front view
3.2 The Hamworthy Heating Ltd frame set and pipe work kit is designed to provide a compact solution for connecting the
boilers to the gas supply and flow and return water connections. The kit locates the pipe work above the boiler casing.
Refer to kit instructions 500005133 for specific information
1550
1500
120
F low
Models F 40-100H ~ Dn50
Models F 125-150H ~ Dn65
Return
Models F 40-100H ~ Dn50
Models F 125-150H ~ Dn65
G as 2”
1
280
9
30 N
o
m
.
12
40 N
o
m
.
105
0 N
o
m
.
125
375
800
750
Flow
Models F40-100H ~ Dn50
Models F125-150H ~ Dn65
Return
Models F40-100H ~ Dn50
Models F125-150H ~ Dn65
Gas 2”
1/2” BSP Socket F+F
for pressure gauge
Содержание F100H
Страница 2: ......
Страница 35: ...HAMWORTHY HEATING LTD 29 FLEET H series 500001212 F Figure 8 2 1 3 Operation and display philosophy...
Страница 44: ...HAMWORTHY HEATING LTD 38 FLEET H series 500001212 F Figure 8 3 11 Operating phases...
Страница 75: ...HAMWORTHY HEATING LTD 69 FLEET H series 500001212 F NOTES...
Страница 77: ...Please complete the information on the Registration Card cut out and return to Hamworthy Heating Ltd...
Страница 78: ......
Страница 79: ......