![background image](http://html1.mh-extra.com/html/hamworthy/f100h/f100h_installation-commissioning-and-operating-instructions_589521011.webp)
HAMWORTHY HEATING LTD
5
FLEET H series
500001212/F
Figure 3.1.2 - Clearances for horizontal flues
Note * relates to the use of the Hamworthy H series pipe work kit.
This can be reduced if the pipe work is behind the boiler.
Figure 3.1.3 - Clearances for vertical flues
Note * relates to the use of the Hamworthy H series pipe work kit.
This can be reduced if the pipe work is behind the boiler.
12
00
m
in*
58
0 m
in (
80
/125
)
93
0 mi
n (
10
0/
15
0)
135
0 (
80/
1
25)
173
0
(
100
/1
50)
1085 max
1040
mi
n*
Содержание F100H
Страница 2: ......
Страница 35: ...HAMWORTHY HEATING LTD 29 FLEET H series 500001212 F Figure 8 2 1 3 Operation and display philosophy...
Страница 44: ...HAMWORTHY HEATING LTD 38 FLEET H series 500001212 F Figure 8 3 11 Operating phases...
Страница 75: ...HAMWORTHY HEATING LTD 69 FLEET H series 500001212 F NOTES...
Страница 77: ...Please complete the information on the Registration Card cut out and return to Hamworthy Heating Ltd...
Страница 78: ......
Страница 79: ......