![HAMPTON BAY H27U-LP Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/hampton-bay/h27u-lp/h27u-lp_owners-and-installation-manual_588203027.webp)
27
Hampton
®
H27U-NG/H27U-LP Direct Vent Freestanding Gas Stove
installation
Pipe Length
Round Support
Box/Wall Thimble
Vertical
Terminal
Storm Collar
Flashing
(0-12/6-12)
Ceiling
Firestop
Pipe Length
(included in 46DVA-KHA)
Dura-Vent Horizontal
Termination Installation
Dura-Vent Vertical
Termination Installation
*Adj.Pipe Length
(included in #46DVA-KHA)
*90 Elbow
(included in 46DVA-KHA)
o
*Round Support
Box/Wall Thimble
(included in 46DVA-KHA)
*Horizontal
Termination Cap
(included in 46DVA-KHA)
Wall Thimble
(B)
Part # 46DVA-WT
Vinyl Siding
Standoff
(Optional)
Part #46DVA-VSS
Cathedral
Ceiling
Support Box
(D)
Vertical Termination Kit
(A)
*Horizontal Termination Kit
Part # 46DVA-KHA
Basic Horizontal Kit
Part # 46DVA-KHA
1 90
o
Elbow
1 Wall Thimble Cover
1 Horiz. Sq. Term. Cap
Dura-Vent Termination Kit
Planning Your Dura-Vent Installation
There are two basic types of Dura-Vent Direct Vent
System installations: horizontal termination and ver-
tical termination. Confirm the maximum horizontal
run and maximum vertical rise from the diagrams
in the "Venting Arrangement" section.
When planning your installation, it will be necessary
to select the proper length of vent pipe for your
particular requirements. For horizontal installations,
determine the minimum clearance from the rear of
the unit to the wall. It is also important to note the
wall thickness. (The wall thimble is suitable for 2
x 4 or 2 x 6 wall construction.) Select the amount
of vertical rise desired for "vertical-to-horizontal"
type installations.
Warning: Always maintain required
clearances (air spaces) to nearby
combustibles to prevent a fire hazard.
Do not fill air spaces with insulation.
The minimum clearance requirements between the
outer wall of the vent pipe and nearby combustible
surfaces is 1-1/2", except when passing through a
wall, ceiling, or at the termination where the use
of a firestop or wall thimble reduces the required
clearance to 1".
Be sure to check the vent termination clearance
requirements from decks, windows, soffits, gas
regulators, air supply inlets and public walkways as
specified in the "Exterior Vent Terminal Locations"
section and in your local building codes.
To determine the length of vent pipe required for
vertical installations, measure the distance from the
unit flue outlet to the ceiling, the ceiling thickness,
the vertical rise in an attic or second storey, and
allow for sufficient vertical height above the roof line.
For multi-storey applications, fire stops are required
at each floor level. If an offset is needed, additional
pipe, elbows and supports will be required.
Do not exceed the maximum number of elbows.
One 90
o
for horizontal terminations and two 45
o
for
vertical termination.
AstroCap
Part# 946-523/P
Alternate Horizontal
Termination Caps
Alternate
Horizontal
Riser Vent
Terminal
Part# 640-530/P
The FPI AstroCap
TM
is certified for installations using FPI venting systems
as well as Simpson Dura-Vent® and Direct Vent Pro.
The FPI AstroCap
TM
is the proprietary trademark of FPI Fireplace Products
International Ltd.
Dura-Vent® and Direct Vent Pro are registered and/or proprietary trademarks
of Simpson Dura-Vent Co. Inc.
Содержание H27U-LP
Страница 49: ...49 Hampton H27U NG H27U LP Direct Vent Freestanding Gas Stove notes...
Страница 54: ...54 Hampton H27U NG H27U LP Direct Vent Freestanding Gas Stove warranty...
Страница 55: ......