background image

13

Capture Jet

®

  with Water Wash Operation & Maintenance Manual

 

OM-0

06/1

120

16/re

v2/EN

OPERATION OF SYSTEM

1.  After installation is complete it will be necessary to check and balance the airflows through each hood. The static 

pressure for each hood is listed in the hood information table on the job specific submittal drawings. The specific 
exhaust static pressure for each hood should be referenced for the airflow balance for that hood.  The exhaust air 
being drawn through the grease filters creates a negative static pressure behind the filters in the exhaust plenum.  
This negative static pressure can be measured and has a direct relationship to the total exhaust airflow measured in 
CFM (Cubic Feet per Minute).  Halton Capture Jet hoods are calibrated based on the model of hood and the number 
of grease filters the hood has.  A static pressure curve is provided with each hood which allows the air balancer to 
easily set up the exhaust fan to draw the correct exhaust CFM through the hood based on measuring the static 
pressure of the exhaust plenum.  On the Capture Jet

® 

line of hoods, Halton supplies T.A.B. (Testing And Balancing) 

ports for measuring the negative static pressure drop through the filters and also the positive Capture Jet

®

 plenum 

pressure. These ports are located on the inside of the capture portion of the canopy on the exhaust and Capture Jet

®

 

plenums.  The T.A.B. port for measuring exhaust static pressure is on the exhaust plenum side of the hood, near 
the top inside panel and is found near one of the corners above the grease filters.  The T.A.B. port for measuring the 
Capture Jet® static pressure is found in the inner front of the hood, near the top inside panel and near one of the 
corners of the inner face.  There is a black plastic cap on each of the brass T.A.B. port fittings to keep them clean.  The 
cap should be removed for taking the static pressure measurements and then replaced when the measurements are 
completed.  The exhaust static pressure is measured using the negative connection on the manometer, leaving the 
positive port of the manometer open to atmosphere.  The Capture Jet

®

 static pressure is measured using the positive 

connection on the manometer, leaving the negative port of the manometer open to atmosphere.  Adjustment to the 
static pressure of the exhaust plenum is made by adjusting the speed of the exhaust fan.  Adjustment to the Capture 
Jet fan is made inside the inner front of the hood at the Capture Jet speed controller.  See procedure below if Capture 
Jet fan adjustment is necessary.     
 

**It is very important that the fan for the Capture Jet

®

 air be balanced according to specifications.

 

See the job specific information for required airflows. The Capture Jet fan is adjusted at the factory for proper airflow.  
Check the static pressure of the Capture Jet plenum and adjust the Capture Jet fan speed only if the pressure 
reading is different than the T.A.B. port pressure specified on the job specific submittal drawings (measured reading 
outside of plus or minus 0.05” w.c.).  Adjustments to the Capture Jet

®

 fan can be made with the speed controller 

supplied with the fan. This speed controller will be mounted inside the Capture Jet plenum; the adjustment control 
knob can be accessed by removing the chrome button cover in the center of the Capture Jet fan access cover.  The 
speed controller is adjusted using a small flathead screwdriver, turning the control clockwise to decrease the speed 
of the Capture Jet fan, and turning the control counterclockwise to increase the speed.  Very small movements of 
the control will result in appreciable static pressure changes to the Capture Jet plenum.  Monitor the manometer 
connected to the T.A.B. port of the Capture Jet plenum as adjustments are made. After each adjustment allow the 
pressure to stabilize before adjusting further.

Содержание Capture Jet KVE-WW

Страница 1: ...pture Jet Hoods with Water WashTechnology Manual provides Operation Maintenance and Service Instructions Form OM006_CAPTURE JET WITH WATER WASH Date 07 11 2016 Rev2 Capture Jet Hoods with Water WashTe...

Страница 2: ...ance Manual In addition to this information technical support is available from the Halton Factory during regular office hours 7 A M to 5 P M Central Time to provide support for products applications...

Страница 3: ...backsplash assembly then the splash assembly should be installed first for installation procedures see pg 6 4 Hang the hood using threaded rods by attaching the rods to the hood through the hanger br...

Страница 4: ...X 1 2 16 8 gallons per minute 2 Supply and connect 1 ips for hot water to control panel provide and connect 1 lines to ventilator sections Supply and connect drains as specified from ventilator secti...

Страница 5: ...5 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN Water Inlet point on back of hood Water Drain point on hood...

Страница 6: ...016 rev2 EN BACKSPLASH INSTALLATION Screw through top flange into wall Screw head will not interfere with hood Screw backsplash to wall or attached with adhesive Halton canopy hoods should be installe...

Страница 7: ...7 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN HOOD INSTALLATION DETAILS...

Страница 8: ...8 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN EXHAUST DUCT CONNECTION DETAILS...

Страница 9: ...9 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN SPLICE STRIP U CHANNEL ASSEMBLIES...

Страница 10: ...10 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN CLOSURE PANEL ASSEMBLY...

Страница 11: ...11 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN...

Страница 12: ...12 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN...

Страница 13: ...them clean The cap should be removed for taking the static pressure measurements and then replaced when the measurements are completed The exhaust static pressure is measured using the negative conne...

Страница 14: ...the removal and replacement process 3 Exhaust airflows should be properly set for each exhaust hood and supply or make up air should be brought into the space to balance the exhaust air leaving the s...

Страница 15: ...tion Maintenance Manual OM 006 112016 rev2 EN CROSS SECTION OF CAPTURE JET WATER WASH HOOD Item Description A Water Wash Intake Supply B Water Wash Nozzle Manifolds C Multi cyclone KSA extractor D Dra...

Страница 16: ...arsh or abrasive cleaners on Stainless Steel or Painted surfaces making sure to wipe clean all interior and exterior surfaces of the hood including the light fixtures Never clean the hood canopy when...

Страница 17: ...the nozzles in the wash manifold that washes the inside of the KSA grease filter The B5 nozzles have an inlet connection size of 1 8 orifice diameter 0 031 The balance of the nozzles which wash the in...

Страница 18: ...Wash Operation Maintenance Manual OM 006 112016 rev2 EN Control Panel Operation The Water Wash control panel is designed to operate only under safe conditions and warn when there are fan failures or o...

Страница 19: ...19 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN...

Страница 20: ...cator will change text from Fan OFF to Fan ON When the exhaust fan is on pressing on the left of the virtual rocker switch will turn the exhaust fan off At the bottom of the screen is a red light that...

Страница 21: ...sired wash cycle start time using the 24 hour format for the days of the week selected The Use End Time should be set 15 seconds later than the Start Time This second setting Use End Time ensures the...

Страница 22: ...xhaust fan is turned off before the first wash cycle starts All wash cycles will complete one after the other until all hoods and or duct sumps have been washed The wash and rinse times are entered in...

Страница 23: ...ack font the alarm is an active alarm The remaining alarm history will be in green font Active alarms require action by an authorized service technician Detergent Prime Pump Screen Press and hold the...

Страница 24: ...n Maintenance Manual OM 006 112016 rev2 EN Menu Options button Pressing the Menu Options button at the bottom left of the screen will bring up a quick access screen overlay that allows the user to sel...

Страница 25: ...r Wash Operation Maintenance Manual OM 006 112016 rev2 EN Water Wash User Guide The Water Wash User Guide button will take you through depictions of all of the screens with explanations of the functio...

Страница 26: ...26 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN...

Страница 27: ...Wash Operation Maintenance Manual OM 006 112016 rev2 EN Electrical Wiring Connections Two electrical wiring diagrams are shown below 1 Control Panel electrical wiring diagram 2 Field wiring diagram CO...

Страница 28: ...28 Capture Jet with Water Wash Operation Maintenance Manual OM 006 112016 rev2 EN FIELD WIRING DIAGRAM...

Страница 29: ...p Date Product Serial Numbers Contact Information Contact Name Title Chef Kitchen Mgr Facility Mgr Property Mgr etc Facility Management Company Name if applicable Email Phone Number Cell Number Fax co...

Страница 30: ...ied third party No claims for labor charges will be approved for payment if work commences without prior authorization by Halton Purchaser shall pay incurred premium labor charge including overtime we...

Отзывы: