SPANNTOP [nova] – Maintenance
8.5 Maintenance schedule
Maintenance tasks are described in the sections above
that are required for optimal and trouble-free operation.
If increased wear is detected during regular inspecti-
ons, then reduce the required maintenance intervals
according to the actual indications of wear.
Contact the manufacturer, [see the service address on
the back] if you have questions concerning mainte-
nance tasks and intervals.
Interval
Maintenance task
Daily
Visual inspection and complete cleaning in case of
heavy contamination [see section »Cleaning«]
Check the end position sensing of the machine regu-
larly.
Clamping force measurement.
Weekly
Clean the clamping unit [see section »Cleaning«]
Clean the taper reception and coupling area [see sec-
tion »Cleaning«]
Grease the clamping unit [see section
»Preservation«]
Every 6 months
Completely disassemble and clean the clamping unit
[see section »Cleaning«]
For proper operation of the coolant feed a pre-
filtering with duplex filter [mesh size 100 μm, PI
3754] is necessary. The duplex filter is moun-
ted on the coolant cleaning system.
102
Содержание SPANNTOP NOVA
Страница 1: ...Installation manual SPANNTOP nova combi pull back combi deadlength modular...
Страница 44: ...SPANNTOP nova Technical data 3 2 1 Clamping force diagram size 32 Fig 5 44 Order hotline 49 7144 907 333...
Страница 45: ...SPANNTOP nova Technical data 3 2 2 Clamping force diagram size 42 52 Fig 6 Order hotline 49 7144 907 333 45...
Страница 46: ...SPANNTOP nova Technical data 3 2 3 Clamping force diagram size 65 80 Fig 7 46 Order hotline 49 7144 907 333...
Страница 47: ...SPANNTOP nova Technical data 3 2 4 Clamping force diagram size 100 125 Fig 8 Order hotline 49 7144 907 333 47...
Страница 48: ...SPANNTOP nova Technical data 3 2 5 Clamping force diagram size 140 160 Fig 9 48 Order hotline 49 7144 907 333...
Страница 110: ...SPANNTOP nova Appendix 110 Order hotline 49 7144 907 333...