5.52.693.00.01.00 

 

 

 

6.3 

Installation on the beam 

1  Tighten the hexagon nut (3) and safety nuts (4). 

2  Push on the trolley at the face of the beam flange. 

3  If  this  is  not  possible,  the trolley  can  also  be  mounted 

on the beam from below. 

4  Therefore, remove the hexagon nut (3) and the safety 

nut (4) on the side without gear. 

5  Pull apart the side plates (1) as far until it is possible to 

push  the  trolley  onto  the  beam  flange  from  below. 
Afterwards, push the trolley together to correct gauge. 

6  Secure  the  washers  (6)  and  distance  tubes  (5)  by 

tightening the hexagon nuts (3) and the safety nuts (4). 

 

 

Illustration 1 

 

 

 

6.3.1 

Bolt securing with collar 

Securing the load bolts with set collars (1) and safety 
screws (3). 

 

  In order to adjust the beam flange width dismantle 

the safety screws (3) at one trolley side. 

  After adjustment of dimension "X" and installation on 

the beam, install the safety screws (3) again and 
secure them with a nut (4). 

  When pulling apart the side plates, the trolley drive 

shaft will also be moved. 

  To do this, loosen the safety screws at the stern tube 

bearing and secure them again after the side plates 
have been pushed together. 

 

Illustration 2 

 

 

1  set collar 

2  load bar 

3  safety screw 

4  hexagon nut 

5  washer

 

 

 

 

   

CAUTION!

 

The distance “X” between the wheel flanges of the trolley wheels must be 
for trolleys up to 3,2 t: 2-3 mm (1-1,5 mm each side) bigger and 

for trolleys from 4 t up: 3-5 mm (1,5-2,5 mm each side) bigger than the flange width "B" of the beam 

 

6.4 

Tools 

 

 

 

 

Capacity 

Size 

Tool 

Use 

 

0,5t 

1t 

to 2t 

to 3,2t 

to 6,3t 

to 10t 

SW27 

SW36 

SW46 

SW55 

SW60 

SW75 

 

Load bar 

 

12,5t 

to 60t 

SW22 

SW24 

 

Load bar  

with 

fixing ring 

 

 

diff. 

 

 

 

Содержание 32/20

Страница 1: ...onorail Trolley Type 32 20 as monorail push travel trolley R as monorail hand geared trolley H as monorail electric trolley E as monorail pneumatic trolley P as swivelling Trolleys Installation Operat...

Страница 2: ...Contents 1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 5 2 5 Basic safety measures 5 3...

Страница 3: ...claims require adherence to all instructions in this manual Before delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage imm...

Страница 4: ...he device is only operated in a fault free fully functional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal prot...

Страница 5: ...ndication label in reactor containment vessels to transport people The device is not suitable for use on stages and in studios Persons must not stand under a suspended load NOTICE If the units are not...

Страница 6: ...o not throw or drop the equipment Use adequate means of transport Transport and means of transport must be suitable for the local conditions 3 2 Safety device for transport NOTICE Should a safety devi...

Страница 7: ...treme environmental impact is the regular use of the equipment 4 4 Important components Wheels Machined wheels with maintenance free roller bearings Profiled wheel surfaces for the use on all standard...

Страница 8: ...type leave a distance for the load hook It is important that the load hangs in the middle under the beam so that the two side plates are equally loaded The suspension eye 9 if existent for bigger load...

Страница 9: ...to adjust the beam flange width dismantle the safety screws 3 at one trolley side After adjustment of dimension X and installation on the beam install the safety screws 3 again and secure them with a...

Страница 10: ...nd chain Control buttons Control symbols shown are for optical information only and can vary depending on the control module Emergency stop Illustration 3 Arrow keys drive left right Illustration 4 Sy...

Страница 11: ...000 kg capacity and without motor driven trolleys of hoisting unit must be tested by a qualified person before putting into operation for the first time Hoists of 1000 kg capacity and up or with more...

Страница 12: ...and check the positions of the end stops 12 Maintenance 12 1 General All monitoring servicing and maintenance operations are to ensure correct functioning of the equipment they must be effected with u...

Страница 13: ...crews 8 from the magnetic body clockwise 5 Tighten the locking screws 6 6 Check the air gap again and re adjust if necessary Illustration 10 13 Inspection 13 1 Periodic checks Independently from the r...

Страница 14: ...the oiler of the maintenance unit Recommendation Should longer periods of standstill be foreseen insert some cm of oil into the air supply hose after the last use of the unit and let the motor run sho...

Страница 15: ...be changed completely If the unit is suitable for explosive atmospheres the motor must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable fo...

Страница 16: ...rried out in accordance with environmental regulations 18 Additional documents 18 1 Electric wiring diagrams Electric wiring diagrams are attached to the consignment or included in the terminal box Ex...

Отзывы: