background image

 

 

 

 

 

 

5.52.693.00.01.00 

 

Technical data 

 

 

electric trolley: travel speed 8/2 m/min. 

pneumatic trolley: travel speed 8 m/min., operation pressure: 6 bar 

 

3-phase current motor 400V/50Hz - IP55 

– F – max. 1000 m above sea level. 

Order-related Special data, refer to the motor nameplate. 

 

Installation 

 

 

The assembly and installation depends on the local environment. The hoist must be suspended in a way that 
it can position itself freely. 

 

 

6.1 

Trolley 

For assembly on a beam a travel limit must be placed at either end of the track. 

This  must  be  attached  so  that  any  elastic  limitation  buffer  or  the  trolley  wheels  are  driven  against  them  in 
their end position when moving.  

Generally, additional lifting gear (e.g. fork lift, lifting platforms) will be required for the assembly. These must 
take the weight of the devices securely. 

 

6.2 

Adjusting the gauge 

The trolley can be adjusted to various beam flange widths. Adjustment to the rel

evant beam flange width “B” 

depends on the type and size and is to be made as follows: 

  There are distance tubes (5) and/or washers 

(6) situated on the load bars (2) of the trolley. 

  Dimension "X" is set by placing washers (6) 

from the outer to the inner side ("X" increases) 
or from the inner to the outer side ("X" 
decreases). 

  Washers (6) and rubber discs (depended on 

type) leave a distance for the load hook. It is 
important that the load hangs in the middle 
under the beam so that the two side plates are 
equally loaded. 

  The suspension eye (9) (if existent) for bigger 

load bolts must still be swivelling after it has 
been secured. 

  Tighten the hexagon nut (3) and safety nuts (4) 

again. 

  Check correct flange width "B" and dimension 

"X". Adjustment must be repeated if necessary. 

 

                    

     

 

 

1  side plates 

2  load bars 

3  hexagon nut 

4  safety nuts 

5  distance tubes 

6  washers 

7  --- 

8   rubber disc (depended on type) 

9   suspension eye

 

 

 

Capacity 

 

 

 

 

beam flange width 

from – to  

 

at 

load bar size

 

curve 

radius 

min. 

 

travel resistance 

Travel path 

when reeling 

off 30 m of 

hand chain 

Motor output 

 

 

 

current rating

 

 

Motor output 

 

Weights 

kg

 

mm

 

mm

 

kW 

kW 

kg 

kg 

kg 

kg 

 

1N 

2N 

 

1000 

50-180 

181-300 

0,65 

55 

0,42/0,1 

1,25/0,8 

not stated 

35 

40 

50 

not 

stated 

2000 

50-170 

171-300 

0,7 

110 

0,42/0,1 

1,25/0,8 

not stated 

50 

55 

65 

not 

stated 

3200 

66-170 

171-300 

0,75 

170 

0,42/0,1 

1,25/0,8 

not stated 

80 

85 

95 

not 

stated 

6300 

74-170 

171-300 

0,8 

230 

5.,5 

0,42/0,1 

1,25/0,8 

not stated 

125 

130 

140 

not 

stated 

10000 

119-160 

161-300 

0,95 

370 

5,5 

0,42/0,1 

1,25/0,8 

not stated 

235 

240 

250 

not 

stated 

15000 

130-220 

221-300 

1,5 

135 

1,5 

2x0,75/0,18 

2x2,65/1,6 

not stated 

380 

395 

410 

not 

stated 

20000 

130-220 

221-300 

1,2 

195 

1.5 

2x0,75/0,18 

2x2,65/1,6 

not stated 

555 

570 

585 

not 

stated 

32000 

160-300 

2,25 

310 

1,5 

2x0,75/0,18 

2x2,65/1,6 

not stated 

750 

765 

780 

not 

stated 

Содержание 32/20

Страница 1: ...onorail Trolley Type 32 20 as monorail push travel trolley R as monorail hand geared trolley H as monorail electric trolley E as monorail pneumatic trolley P as swivelling Trolleys Installation Operat...

Страница 2: ...Contents 1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 5 2 5 Basic safety measures 5 3...

Страница 3: ...claims require adherence to all instructions in this manual Before delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage imm...

Страница 4: ...he device is only operated in a fault free fully functional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal prot...

Страница 5: ...ndication label in reactor containment vessels to transport people The device is not suitable for use on stages and in studios Persons must not stand under a suspended load NOTICE If the units are not...

Страница 6: ...o not throw or drop the equipment Use adequate means of transport Transport and means of transport must be suitable for the local conditions 3 2 Safety device for transport NOTICE Should a safety devi...

Страница 7: ...treme environmental impact is the regular use of the equipment 4 4 Important components Wheels Machined wheels with maintenance free roller bearings Profiled wheel surfaces for the use on all standard...

Страница 8: ...type leave a distance for the load hook It is important that the load hangs in the middle under the beam so that the two side plates are equally loaded The suspension eye 9 if existent for bigger load...

Страница 9: ...to adjust the beam flange width dismantle the safety screws 3 at one trolley side After adjustment of dimension X and installation on the beam install the safety screws 3 again and secure them with a...

Страница 10: ...nd chain Control buttons Control symbols shown are for optical information only and can vary depending on the control module Emergency stop Illustration 3 Arrow keys drive left right Illustration 4 Sy...

Страница 11: ...000 kg capacity and without motor driven trolleys of hoisting unit must be tested by a qualified person before putting into operation for the first time Hoists of 1000 kg capacity and up or with more...

Страница 12: ...and check the positions of the end stops 12 Maintenance 12 1 General All monitoring servicing and maintenance operations are to ensure correct functioning of the equipment they must be effected with u...

Страница 13: ...crews 8 from the magnetic body clockwise 5 Tighten the locking screws 6 6 Check the air gap again and re adjust if necessary Illustration 10 13 Inspection 13 1 Periodic checks Independently from the r...

Страница 14: ...the oiler of the maintenance unit Recommendation Should longer periods of standstill be foreseen insert some cm of oil into the air supply hose after the last use of the unit and let the motor run sho...

Страница 15: ...be changed completely If the unit is suitable for explosive atmospheres the motor must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable fo...

Страница 16: ...rried out in accordance with environmental regulations 18 Additional documents 18 1 Electric wiring diagrams Electric wiring diagrams are attached to the consignment or included in the terminal box Ex...

Отзывы: