Habasit Italiana S.p.A.
Vittorio Veneto 31029 (TV)
Tel.: ++39(0)438.9113
Regulating Unit PMR-06
Fax. ++39(0)438.200545
Author:
S.D.T. / KM
CONNECTIONS
Editon: 12/2005
Page
F-8
Replaces: 05/2005
F.2
GENERAL REMARKS
ATTENTION
Refer to the manuals of the press and the equipment connected to the system and
make sure you carry out all the operations required for the safe use of the whole
system.
Check the working procedures for the belt/tape, check technical guidelines of the joining
method and the individual Joining Data Sheet of the product.
Ensure the press is properly prepared in accordance with the specific manual's
instructions.
Ensure the equipment is correctly connected and set up in accordance with this manual.
Turn the main switch to “ON”.
Load the job program with the settings for the product to be joined or set the settings
manually.
Push the green START joining cycle button.
Wait until the end of the process.
Push the red End of Process button.
The equipment is now ready for the next work cycle.
ATTENTION
Refer to the manuals of the press and the equipment connected to the system
and make sure you carry out all the operations required for the safe use of the
whole system.
Regulating Unit PMR-06