Habasit Italiana S.p.A.
Vittorio Veneto 31029 (TV)
Tel.: ++39(0)438.9113
Regulating Unit PMR-06
Fax. ++39(0)438.200545
Author:
S.D.T. / KM
INSTALLATION
Editon: 12/2005
Page
C-4
Replaces: 05/2005
C.3
FITTING AND INSTALLATION
C.3.1
P
RELIMINARY CHECK
Carry out a visual check on the regulating unit's appearance and on any accompanying
equipment to see if there are signs of damage or breakage that may have occurred in
transit. If such damage and/or failures are noted, contact HABASIT immediately. We
advise you to also produce photographic evidence of the damage.
C.3.2
P
OSITIONING
IMPORTANT
Check there are no dangers in the environment such as water, damp or their
consequences.
Make sure there is sufficient operational space for working on the regulating unit.
Position the equipment so that it is stable.
Check visually
to make sure that no rags, work tools, etc. remain on the regulating
unit.
Regulating Unit PMR-06