95
preparing for installation,
preventing
EMI prevention,
procedure
configuring IRF basic settings,
connecting AC power cord,
connecting grounding cable to chassis,
connecting grounding cable to grounding
strip,
connecting IRF physical ports,
connecting power cord,
connecting PSR150-D1,
connecting
PSR360-56A/PSR720-56A/PSR1110-56A,
grounding switch through AC power cord,
grounding switch with a grounding conductor
buried in the earth ground,
grounding switch with grounding strip,
grounding the switch,
identifying IRF master switch,
identifying IRF member switch physical ports,
installing PSR150 power module,
installing
PSR360-56A/PSR720-56A/PSR1110-56A
power module,
installing switch,
installing switch in 19-inch rack,
mounting switch on workbench,
planning IRF connections,
planning IRF fabric installation site,
planning IRF topology,
rack-mounting by using front and rear mounting
brackets on 19-inch rack,
rack-mounting by using front mounting brackets
and mounting rail assemblies on 19-inch
rack-mounting by using front mounting brackets
on 19-inch rack,
removing
PPSR360-56A/PSR720-56A/PSR1110-56A
power module,
removing PSR150 power module,
setting up IRF fabric,
troubleshooting fan failure,
troubleshooting fixed fan failure,
troubleshooting fixed power module failure,
troubleshooting garbled display,
troubleshooting hot swappable fan failure,
troubleshooting hot-swappable power module
failure,
troubleshooting no display,
troubleshooting power module failure,
PSR150 power module
installation,
PSR150-A1
PSR150-D1
PSR360-56A/PSR720-56A/PSR1110-56A
PSR360-56A/PSR720-56A/PSR1110-56A power
module
installation,
Q
QSFP+
port,
port LED,
R
rack
switch installation in 19-inch rack,
verifying switch installation,
removing
,
expansion card,
power module,
PSR150 power module,
PSR360-56A/PSR720-56A/PSR1110-56A power
module,
,
S
safety
EMI prevention,
grounding switch through AC power cord,
grounding the switch,