11-4
Figure11-5 Routing MPU cables
Routing fabric module cables
As a best practice, route the fabric module cables along the nearest cable management fingers and
cable management brackets.
For example, the router is installed with CR-19K-MSFU-20C fabric modules. As shown in
each CR-19K-MSFU-20C fabric module has 6 groups of ports, with 3 groups on the upper half of the
module and 3 groups on the lower half. Use the cable management fingers and cable management
brackets for the cables as follows:
•
Cables from the ports on the upper half of each module
—Upper cable management finger
for the slot.
•
Cables from the ports on the lower half of each module
—Lower cable management finger
for the slot.
•
Cables from the fabric modules in slots 22 to 24 (left slots)
—Left cable management
bracket.
Содержание CR19000-20
Страница 11: ...1 5 Figure1 1 Chassis dimensions...
Страница 39: ...2 9 Figure2 7 Securing the router to the rack...
Страница 61: ...4 2 Figure4 1 Slot arrangement...
Страница 84: ...6 5 Figure6 4 Installing an air filter...
Страница 97: ...8 9 Figure8 9 Removing a fan tray...
Страница 103: ...8 15 Figure8 18 Securing the new power tray...
Страница 131: ...11 7 Figure11 8 Routing AC power cords...
Страница 132: ...11 8 Figure11 9 Routing DC power cords...
Страница 139: ...12 6 Figure12 3 Packing component positions...