![H3C CR19000-20 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/h3c/cr19000-20/cr19000-20_installation-manual_3148432037.webp)
2-7
3.
Insert cage nuts into the marked square holes in the front rack posts.
Figure2-5 Installing the cage nuts
4.
Orient the chassis with the rear facing the front of the rack.
5.
Use a minimum of four people to lift the router to a height slightly above the slide rails by holding
the chassis handles. Then place the router on the slide rails.
CAUTION:
After you place the router on the slide rails from front of the rack, do not leave go of your hands
immediately because this might tip and damage the router.
6.
All people work in cooperation to slide the router along the guide rails into the rack until the
mounting brackets on the router come into contact with the front rack posts.
The persons in front of the chassis push and a person in back of the chassis pulls the chassis by
holding two horizontal handles in the fan tray area (as shown in
).
CAUTION:
To avoid damaging the handles in the fan tray area, apply force only in the horizontal direction
rather than vertical direction when using the handles to pull the chassis.
Содержание CR19000-20
Страница 11: ...1 5 Figure1 1 Chassis dimensions...
Страница 39: ...2 9 Figure2 7 Securing the router to the rack...
Страница 61: ...4 2 Figure4 1 Slot arrangement...
Страница 84: ...6 5 Figure6 4 Installing an air filter...
Страница 97: ...8 9 Figure8 9 Removing a fan tray...
Страница 103: ...8 15 Figure8 18 Securing the new power tray...
Страница 131: ...11 7 Figure11 8 Routing AC power cords...
Страница 132: ...11 8 Figure11 9 Routing DC power cords...
Страница 139: ...12 6 Figure12 3 Packing component positions...