Figure1-17 Installation tools
Pre-installation checklist
Table1-6 Pre-installation checklist
Item
Requirements
Result
Safety precautions
•
The router is far away from any moist areas and
heat sources.
•
The power-off switch in the equipment room is
located.
Installation site
Load bearing
•
The floor or ground at the installation site can
support the combined weight of the router and the
rack.
•
The slide rails can support the actual weight of the
router.
Space
•
There is a minimum clear height of 3 m (9.84 ft)
(from the beam or the air duct to the floor) in the
equipment room.
•
There is a minimum clearance of 1200 mm (47.24
in) between the rack and walls or other devices
Ventilation
•
A good ventilation system is available at the
installation site.
•
The air inlet and outlet vents of the router are not
blocked and adequate clearance is reserved
around the air vents.
Temperature and
The temperature and humidity conditions in the
Содержание CR19000-20
Страница 11: ...1 5 Figure1 1 Chassis dimensions...
Страница 39: ...2 9 Figure2 7 Securing the router to the rack...
Страница 61: ...4 2 Figure4 1 Slot arrangement...
Страница 84: ...6 5 Figure6 4 Installing an air filter...
Страница 97: ...8 9 Figure8 9 Removing a fan tray...
Страница 103: ...8 15 Figure8 18 Securing the new power tray...
Страница 131: ...11 7 Figure11 8 Routing AC power cords...
Страница 132: ...11 8 Figure11 9 Routing DC power cords...
Страница 139: ...12 6 Figure12 3 Packing component positions...