4/29
C Clamp (for BP.C or BP.CX machines)
A. Close / Weld
B. Remote control of the
sheet’s thickness
Locking /unlocking C - lever
C arm
Mobile electrode
3- INSTALLATION OF THE MACHINE
Before use
Several verifications are necessary before using the unit to ensure good performance of the machine.
Here are the verifications to do :
-
Check the electrical line voltage : it should be
400V
, 3 phases, with a
32 A delayed circuit breaker, curve D
(or fuse of aM type).
-
Check the cross section of the cable going from the main electrical board to the socket where the machine will
be plugged : it should be
4x6 mm2
. If this cable is longer than 10m, use a conductor size of 10mm². If you use
an electrical extension cord, use a 6mm² conductor size (10mm² if electrical line + extension cord total length is
superior to 10m).
-
Connect a
3 phase + earth plug
(minimum 32A) on the supply cable.
-
Be careful: in order to avoid voltage drops which can generate bad welding spots, you must never have
overloaded electrical lines, nor supply cable diameters which cross section are not large enough. Also, the mains
plugs must not be too far from the circuit breaker.
-
If the machine is not sufficiently supplied, it is not possible to ensure a good welding quality.
-
Check that the
air compressed
network can deliver a
minimum of 7 bars
(dry air), then connect the
compressed air network on the back of the machine. The machine must not be used on an air compressed
network with a pressure inferior to 3 bars.