Installation and commissioning
Installation of the switch box, construction type “External Unit”
5.8.2
Permissible installation site for a switch box
The switch box must be mounted so that
the cooling vanes are vertical and to ensure
unobstructed air convection through the cooling
vanes.
The plug connections on the switch box must
face down in the installation position.
Other installation positions are not
permitted.
5.8.3
Installing the generator connection cable
The connection cable must be installed between the switch box and
generator in accordance with the instructions and regulations.
Ö
Installation of cables, page 64.
On the switch boxes for
i
MAPLA 8,
i
MAPLA 13,
i
MAPLA 17, the connection
cable is firmly connected to the switch box and has a connector plug for the
generator.
On the
i
MAPLA 20 and 25 system, the connection cable is securely connected
to the generator and has a connector plug for the switch box.
ok
i
MAPLA 8 + 13
ok
iMAPLA
17+25
i
MAPLA 17,
20 and 25